11. Maintenance
11.6 Cooling liquid re
fi
ll
W
ARNING
:
This procedure may only be performed by quali
fi
ed technical service personnel.
Order info cooling liquid
B1909086K : bottle of 1 liter cooling liquid.
Necessary parts
Cooling liquid
How to re
fi
ll
1. Remove the side cover, see "Removal of the side cover", page 101.
2. Open the
fi
ller cap by turning it anti clockwise.
Max
Min
Image 11-6
Cooling liquid re
fi
ll
3. Fill the reservoir with cooling liquid until the level is equal with the
Max
indication on the reservoir.
4. Close the reservoir again. Turn the
fi
ller cap clockwise to close the reservoir.
5. Reinstall the side cover.
C
AUTION
:
Never
fi
ll above Max level mark !
R59770491 DP2K-32B 30/04/2010
117
Summary of Contents for DP2K--32B
Page 1: ...DP2K 32B Installation manual R59770491 00 30 04 2010...
Page 5: ...Projector Pb Hg Cd Cr6 PBB PBDE x o o o o o o o o o o o o o o o o o x o o o o o RoHS...
Page 6: ......
Page 9: ...1 Safety 1 SAFETY R59770491 DP2K 32B 30 04 2010 3...
Page 36: ...3 Physical installation 30 R59770491 DP2K 32B 30 04 2010...
Page 42: ...4 Lamp lamp house Image 4 6 Remove lamp house 36 R59770491 DP2K 32B 30 04 2010...
Page 52: ...4 Lamp lamp house 4 Reinstall the lamp cover of the projector 46 R59770491 DP2K 32B 30 04 2010...
Page 56: ...4 Lamp lamp house 50 R59770491 DP2K 32B 30 04 2010...
Page 84: ...7 Communicator Touch Panel 78 R59770491 DP2K 32B 30 04 2010...
Page 88: ...8 Starting up 82 R59770491 DP2K 32B 30 04 2010...
Page 96: ...9 Projector registration Image 9 9 Add new owner 90 R59770491 DP2K 32B 30 04 2010...
Page 116: ...10 Removal and installation of the projector covers 110 R59770491 DP2K 32B 30 04 2010...