3. Installation Guidelines
3.10 Rigging points and Accessories
Clamps
Slots are made in the carry handle frame for easy inserting the overlockers and for easy adjusting the clamps position so that this
position matches with the rigging points.
Consult a professional structural engineer prior to suspending the ceiling mount from a structure not intended for that use. Always
ensure the working load limit of the structure supporting the projector.
Image 3-27
Mounting the clamps
Image 3-28
Mounting the clamps
W
ARNING
:
When mounting the projector to the ceiling or to a rigging system, always mount security chains.
How to mount the clamps?
To fix the clamps to the U-profile, follow the next procedure :
1. Measure the distance, center tube as reference, between the two used support bars of a truss.
2. Slide the clamps holders (2 per profile) on its place in the U-profile according the measured distance and secure this position.
3. Turn the overlockers in the holes of the clamp holder.
The overlocker can turn around.
Image 3-29
Mounting the clamp — detail
28
R5976386 BARCOSLM G8 20/10/2004
Summary of Contents for BarcoSLM G8
Page 1: ...BarcoSLM G8 Owner s manual R9002820 R5976386 05 20 10 2004 ...
Page 4: ......
Page 8: ...Table of contents 4 R5976386 BARCOSLM G8 20 10 2004 ...
Page 13: ...2 Packaging and Dimensions Image 2 4 Top view dimensions R5976386 BARCOSLM G8 20 10 2004 9 ...
Page 14: ...2 Packaging and Dimensions 10 R5976386 BARCOSLM G8 20 10 2004 ...
Page 34: ...3 Installation Guidelines 30 R5976386 BARCOSLM G8 20 10 2004 ...
Page 92: ...7 Random Access Adjustment Mode 88 R5976386 BARCOSLM G8 20 10 2004 ...
Page 124: ...10 Programmable Function Keys 120 R5976386 BARCOSLM G8 20 10 2004 ...
Page 128: ...A Standard Source set up Files 124 R5976386 BARCOSLM G8 20 10 2004 ...
Page 146: ...B Barco Control Manager 142 R5976386 BARCOSLM G8 20 10 2004 ...