3. Installation Guidelines
C
B
B
Image 3-25
Mounting the security hook (detail)
How to open a secured rigging point?
1. Push the ring (A) of the first projector downwards and hold it in that position. (image 3-26)
2. Turn the locked part (B) of the second projector a quarter counter clockwise and move it upwards.
A
B
Image 3-26
Opening the rigging sockets
R5976386 BARCOSLM G8 20/10/2004
27
Summary of Contents for BarcoSLM G8
Page 1: ...BarcoSLM G8 Owner s manual R9002820 R5976386 05 20 10 2004 ...
Page 4: ......
Page 8: ...Table of contents 4 R5976386 BARCOSLM G8 20 10 2004 ...
Page 13: ...2 Packaging and Dimensions Image 2 4 Top view dimensions R5976386 BARCOSLM G8 20 10 2004 9 ...
Page 14: ...2 Packaging and Dimensions 10 R5976386 BARCOSLM G8 20 10 2004 ...
Page 34: ...3 Installation Guidelines 30 R5976386 BARCOSLM G8 20 10 2004 ...
Page 92: ...7 Random Access Adjustment Mode 88 R5976386 BARCOSLM G8 20 10 2004 ...
Page 124: ...10 Programmable Function Keys 120 R5976386 BARCOSLM G8 20 10 2004 ...
Page 128: ...A Standard Source set up Files 124 R5976386 BARCOSLM G8 20 10 2004 ...
Page 146: ...B Barco Control Manager 142 R5976386 BARCOSLM G8 20 10 2004 ...