35
ENERGA 70-55 TUNNEL
Figure 3: Operation Energa 70-55 Tunnel
1 Flue outlet
7 Combustion air-supply slider
2 Convection air escape opening (4x)
(Combined operation for the primary
3
Operating pin fl ue gas fl ap
and secondary combustion air-supply)
4 Door (2x) (*)
8 Handle door
5 Locking slider for operating pin
9 Combustion air supply; underneath
6 Carrying bracket (can be
10 Convection air supply connection (2x side)
dismounted) (2x)
11 Adjustable feet (4x)
(*)
Only use the door that can depress the operating
pin as opening for fi lling the wood !
5
OPERATION OF THE BUILT-IN FIRE
Summary of Contents for ENERGA 70-55 TUNNEL
Page 2: ......
Page 3: ...3 ENERGA 70 55 TUNNEL ENERGA 70 55 TUNNEL...
Page 4: ...4 ENERGA 70 55 TUNNEL...
Page 6: ...6 ENERGA 70 55 TUNNEL...
Page 8: ...8 ENERGA 70 55 TUNNEL...
Page 10: ...10 ENERGA 70 55 TUNNEL...
Page 61: ......