43
CUATRO-3 75
Installation instructions
• If the appliance is to be placed against a bearing wall or against a wall containing
fl ammable material, an air gap of at least 20 mm should fi rst be created.
Before it a false wall, 100 mm thick, must be built of masonry or aerated concrete.
• If the appliance is not placed against a bearing wall or a wall containing fl ammable
material, no false wall is necessary. Layers of insulation of at least 100-mm thickness
will then be suffi cient (class A1, DIN 4102-compliant). See also section 3.3.
• After four weeks, your appliance will be ready for use.
3.3.5 Connecting the smoke outlet
The appliance comes with a detachable smoke outlet connection; Cuatro-3 75:
Ø200 mm (Ø198 mm external). This connection is intended for steel pipes, double/
single-skinned stainless steel (insulated) fl ues or double/single-skinned fl exible stainless
steel fl ues.
After the appliance has been installed, it can be connected to the fl ue.
In order to be able to disassemble the smoke outlet connection, remove the fl ue gas
fl ap and the brake plate fi rst. See Chapter 6 for the disassembly sequence: “Sequence
for replacing the interior of the appliance”.
• Disassembling the smoke outlet connection.
Summary of Contents for CUATRO-3 75
Page 2: ......
Page 4: ...4 CUATRO 3 75 Installation instructions...
Page 6: ...6 CUATRO 3 75 Installation instructions...
Page 26: ...26 CUATRO 3 75 Installation instructions Opening of 4 convection air outlets...
Page 69: ...69 CUATRO 3 75 Installation instructions...
Page 70: ...70 CUATRO 3 75 Installation instructions...
Page 71: ......