FEEDBANK 300
WWW.BANKSOUTDOORS.COM
9
4. After the cover and Feeder Ports are installed, you need to purchase
an 8’ 4x4 green-treated post. Dig into the ground 3’ and backfill the
post so it is level.
5. Slide Feedbank over the post.
6. Another option is to cut off a tree and slide it over a trunk of the
stree - just be sure to cut it off level.
7. Fill with feed. All feed ports slide in and out, when t-style thumb bolt
is loosened to control flow. Set flow according to type of feed you are
using.
8. Your Feedbank is ready to go!
Summary of Contents for FEEDBANK 40
Page 1: ...INSTRUCTIONMANUAL...