FEEDBANK 150
WWW.BANKSOUTDOORS.COM
7
4. After the cover and Feed Ports are installed, you need to purchase an
8’ 4x4 green-treated post. Dig into the ground 4’ and backfill the post so
it is level.
5. Slide Feedbank over the post.
6. Another option is to cut off a tree and slide it over a trunk of the
stree - just be sure to cut it off level, leaving 4’ above the ground.
7. Fill with feed. All feed ports slide in and out, when bolts are loosened
to control flow. Set flow according to type of feed you are using.
8. Your Feedbank is ready to go!
Summary of Contents for FEEDBANK 40
Page 1: ...INSTRUCTIONMANUAL...