6- Install the metal case, taking into account that the upper end of the case must be approximately 10 mm above

ground level (to limit rainwater flowing into the case) 

E(6a - 6b)

.

7- Once the metal case has been positioned and before cementing it, perfectly level the surface using a spirit level

A(6a - 6b) 

so that the bollard can move perfectly vertically. The flooring or road paving must be flush with the

upper end of the metal case

 B(6a - 6b)

.

8- Once  the  metal  case  is  in  position  and  before  pouring  the  concrete,  install  a  flexible  tube  with  an  inside

diameter of 50 mm through which to run the electric cables 

D(6a - 6b)

 coming from the control unit.

9- Pour concrete (Rck=  25 N/mm²) all around the case with a pump truck and vibrate the casting.
10- Lay  the  other  pipes  from  the  point  where  the  control  unit  is  installed  to  the  point  where  the  additional

accessories are installed (traffic lights, magnetic coils, etc.), and prepare for electrical connection, earthing and
any controls.

11- Wait at least two weeks for the concrete to reach 80% of its mechanical properties and then finish the road

surface.

12- Fit the adjusting screws 

D(7) 

in the position indicated.

13- Install the TOUCHE bollard in the metal case after removing the three screws 

C(7). 

Remove the cap 

B(7)

 and fit

the three M20 eyebolts 

A(7)

 in the threaded holes. Lift TOUCHE 

(8)

 using a winch or lift truck hooking it into the 3

eyebolts and install it in the metal case after fitting the connection line in the previously prepared tube 

B(8)

.

It  is  advisable  to  use  a  cable  puller  to  run  the  electric  cables  through  the  tube  in  order  not  to  damage
them.

14- Check  that  the  top  of  the TOUCHE  bollard  is  level  using  a  spirit  level.  If  necessary,  adjust  by  turning  the

adjustment screws 

D(7)

.

15- It is advisable to lubricate the retaining screws and the bollard 

(9)

 cap lock screws with grease, which will make

future maintenance operations easier.

In the event of violent impact against the raised bollard which can compromise its operation, the bollard can be 
quickly removed from its seat.
This operation can be carried out in two ways, both taking maximum 5-10 minutes.

METHOD 1

Three operators are required to simultaneously perform the following operations: 
1- After cutting the power to the main electric panel, the first operator disconnects the electric cables 

(10)

 so that

they can be pulled out when TOUCHE is removed.

2- The second operator unscrews the covering collar screws 

(11)

, removes the collar, unscrews the TOUCHE

retaining screws

 (12) 

and then screws on the three M20 eyebolts.

3- Hook into the eyebolts using a rigid pipe at least 2,5 m long and a cord.
4- The third operator lifts the bollard while the other two operators pull out the electric cables taking the utmost care

not to damage them 

(13)

. The cables must be completely removed from their seat.

METHOD 2

Two operators are required to simultaneously perform the following operations: 
1- After cutting the power to the main electric panel, the first operator disconnects the electric cables 

(10)

 so that

they can be pulled out when TOUCHE is removed.

Tools required:

A

 

n° 6 allen wrench for the bollard cap and a n°8 Allen wrench for the flange retaining screws

Three M20 eyebolts

Rigid pipe at least 2,5m long

Cord or chain to hook onto the eyebolts

REMOVING THE BOLLARD

16

TOUCHE

Summary of Contents for GBD TOUCHE

Page 1: ...TOUCHE UK TOUCHE 120 275 Hydraulic rising bollards INSTRUCTIONS FOR INSTALLATIONS...

Page 2: ...TOUCHE 2 9 1b 1a 2 1 3 4 5 10 14 15 17 18 230V 10 50Hz 16 6 7 8 9 11 12 TOUCHE275 TOUCHE120 2 1 3 4 5 10 14 15 17 18 230V 10 50Hz 16 6 7 8 9 11 13 12...

Page 3: ...Yellow green 1 2 3 4 Grigio Grey Nero Black Marrone Brown Terra Ground COM Apertura Opening Chiusura Closing brown cable grey cable black cable opening COM closing brown cable grey cable black cable...

Page 4: ...20 10 17 14 15 13 16 12 11 HYDRAULIC CONTROL UNIT MOTOR POWER SUPPLY SENSOR BOARD POWER SUPPLY 1 2 3 4 5 6 7 8 9 10 m 1 2 3 4 5 6 7 8 9 10 m SENSOR BOARD POWER SUPPLY HYDRAULIC CONTROL UNIT MOTOR POWE...

Page 5: ...4 5 TOUCHE Exit coil Exit coil Entrance coil Entrance coil 9 5 1285 mm 300 mm 450 mm TOUCHE120 630x530 mm 300 mm 1440 mm TOUCHE275...

Page 6: ...6 6a TOUCHE 300 mm 406 mm 1 2 3 3 4 B 300 mm 200 mm 10 mm E D 4 5 5 6 F C A 1600 1650 mm 300 mm 100 mm 9 6b 300 mm 406 mm 1 2 3 3 4 B 300 mm 200 mm 10 mm E D 4 5 5 6 F C A 1600 1650 mm 300 mm 100 mm...

Page 7: ...7 7 8 TOUCHE D 33 mm B C A D 33 mm B C A TOUCHE120 TOUCHE275 A B B A PULL THE CABLES CAREFULLY PULL THE CABLES CAREFULLY...

Page 8: ...8 TOUCHE 9 10 11 12 GREASE TOUCHE120 TOUCHE120 TOUCHE120 TOUCHE275 TOUCHE275 TOUCHE275...

Page 9: ...9 TOUCHE 13 14 TOUCHE120 TOUCHE120 TOUCHE275 TOUCHE275...

Page 10: ...10 TOUCHE 15 B A 16 17 B A TOUCHE120 TOUCHE120 TOUCHE120 TOUCHE275 TOUCHE275 TOUCHE275...

Page 11: ...11...

Page 12: ...butalwayscallinqualified andauthorisedtechnicians The automated device is packed on Europallets and must be handled with the utmost care using approved pallet transportersorlifttrucks Checkthattheeart...

Page 13: ...eceiver 3 Entrancemetaldetector 4 Exitmetaldetector 5 Anti break inprotectioncabinet 6 Waterproofboxforelectricalconnectionstotheexitinductivecoil 7 Undergroundinductivecoilatexit 8 Waterproofboxforel...

Page 14: ...Resistance to impact without deformation Breakthrough resistance Manual lowering Annual cycles with 8 operating hours a day Heavy use Operator Type Hydraulic rising bollards Hydraulic rising bollards...

Page 15: ...disturbance that may condition the metal detector coils It is recommended to install the magnetic coil according to a rectangular perimeter with the longest side perpendicular to the movement directio...

Page 16: ...cable puller to run the electric cables through the tube in order not to damage them 14 Check that the top of the TOUCHE bollard is level using a spirit level If necessary adjust by turning the adjus...

Page 17: ...the unlocking key A 15 inthelockunderneathandthebollardwillautomaticallyretractintoitsseat For optimal system performance over time and in accordance with the safety regulations proper maintenance and...

Page 18: ...ckfunctioningoftheradiocontrolreceiver Gi Bi Di Srlreservestherighttochangethetechnicaldatawithoutpriornoticeinrelationtoproductdevelopment Intheeventofanymalfunction cutthepowertothesystemandcallinaq...

Page 19: ...HIDRAULIC RISING BOLLARDS TOUCHE Are in conformity with the following CEE Directives and that the following harmonised standards have been applied Data 30 09 09 S r l LVDDirective2006 95 CEandsubsequ...

Page 20: ...gn Installer company stamp Date Technician sign Date Notes Technician sign Installer company stamp Date Technician sign Date Notes Technician sign Installer company stamp Date Technician sign Date Not...

Page 21: ...21 TOUCHE NOTE...

Page 22: ...DI S r l 46025 Poggio Rusco MN ITALY Tel 39 0386 52 20 11 Fax 39 0386 52 20 31 E mail comm gibidi com Numero Verde 800 290156 Via Abetone Brennero 177 B w w w g i b i d i c o m Cod AIC6518 10 2009 Re...

Reviews: