1686-001 en/2022-05
17/52
Preparation for operation
/4
4 Preparation for operation
4.1 Installation site requirements
The installation location of the ultrasound bath must meet the fol-
lowing conditions:
• The installation surface must be horizontal, firm and dry.
• The load-bearing capacity must be sufficient for the ultrasound
bath with the sonication fluid. For weight and work content, see
chapter
• Adequate ventilation must be ensured. The air supply under the
bottom of the unit may not be obstructed. If a sound proof box
is used, it must also ensure sufficient ventilation.
• A water connection should be available nearby to fill the ultra-
sound bath. A basin must be available to drain or pour out the
sonication fluid.
4.2 Fitting ball valve
Concerns devices from DT 102 H / DT 102 H-RC.
Fit the supplied ball valve, the hose grommet and the hose as
described in the assembly instructions included with the ball valve.