BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925
Document # A92051 rev. H
© Copyright
BAND-IT-IDEX, Inc. 2006
All rights reserved
www.BAND-IT-IDEX.com
Page 1 of 4
A92079
Tie-Lok II Tool
Warning:
Always wear safety glasses when operating hand tool.
Instructions:
1. Turn tension adjustment knob until
desired tension setting is displayed in
tension
indicator
window.
Space
between numbers counts as one-half
setting. See step 6.
2. Extend handle open to release gripping
mechanism and insert clamp tail into tool
through front load entry.
3. Squeeze handle repeatedly to tighten
band around object. Be sure to release
handle completely to use full pull-up
stroke of tool. Buckle must be secure
against the tool head and nestled
between the two retention clips. Once
the preset tension has been reached, the
handle will no longer release completely.
4. To cut-off excess clamp tail, squeeze
handle one last time.
5. The tool must be reset by, extending the
handle out until it snaps into place, the
tool will be ready to apply the next
clamp.
6. Tension Setting Range:
.250 Smooth I.D. Tie-Lok 0 – 8
Operating
Instructions
Tension Indicator
Window
Handle
Tension
Adjustment
Knob