UHD S
TANDARD
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION AND
S
ERVICE
M
ANUAL
12 of 55
terminals.
See Page 15, Figure 10
. As an option, the
vent and air intake are run as separate pipes to a
concentric vent box and a concentric vent/air intake
pipe penetrates the wall or roof.
See Page 15,
Figure 11
and Page 16, Figure 12
.
For separated combustion installation, the vent and
air intake must be fitted with an individual and
correctly sized sealed system and the vent and air
intake must terminate at approved wall and roof
terminals.
Separated combustion units may not be common
vented.
7.3 Horizontal Venting
Horizontally vented heaters must be individually
vented, no common venting.
Vent pipe must be sloped ¼" (.6 cm) downward for
every 1' (.3 m).
In noncombustible walls only, vent terminal (P/N
02537801-1P) may be used.
For 4'' (10 cm) vents in either combustible or
noncombustible walls, use vent terminal (P/N
90502100) or equivalent insulated vent terminal.
Follow the manufacturer's instructions for proper
installation.
Instead of an insulated vent terminal, a listed thimble
with 2" (5 cm) air gap may be used with a 4" (10 cm)
vent cap (P/N 90502102).
7.4 Vertical Venting
Vertically vented standard vented heaters can be
common vented (up to four heaters).
For 4'' (10 cm) common vent, an approved vent cap
(P/N 90502102) must be used.
For 6'' (15 cm) common vent, an approved vent cap
(P/N 90502103) must be used.
For common vertical venting of more than two
heaters,
See Page 14, Figure 9
.
A vent shall not extend less than 2' (.6 m) above the
highest point where it passes through a flat roof of a
building.
7.5 Maximum Vent Lengths Table
7.6 Vent Material
Vent material may be single wall 26 ga. (minimum)
galvanized steel or equal thickness stainless steel.
Completely seal all joints, refer to
Page 11, Section
7.2
.
If penetrating a combustible wall or roof, a listed
thimble with 2" (5 cm) clearance must be used.
Where local codes permit, a single section of type
B-1 vent material may be used at the roof or wall
penetration instead of a thimble. Ensure vent
manufacturer's clearance from vent material is
maintained. Seal annular space of the type B-1 vent
as well as all joints in the remaining vent.
7.7 Replacing an Existing Heater in a Venting
System
When replacing an existing heater in a venting
system, the venting system may not be properly
sized to vent the new heater. The following steps
must be followed with each piece of equipment
connected to the venting system placed in
operation, while any other equipment connected to
the venting system are not in operation.
1. Seal any unused openings in the venting sys-
tem.
2. Inspect the venting system for proper size and
horizontal pitch, as required by the NFPA 54/
ANSI Z223.1 - latest revision, National Fuel
Gas Code (US) or Standard CSA B149.1
Natural Gas and Propane Installation Code
(Canada) and these instructions. Determine
that there is no blockage or restriction, leakage,
corrosion and other deficiencies which could
cause an unsafe condition.
3. Close all building doors and windows and all
doors between the space in which the piece(s)
of equipment connected to the venting system
are located and other spaces of the building.
Turn on clothes dryers and any exhaust fans,
such as range hoods and bathroom exhausts
so that they shall operate at maximum speed.
Do not operate a summer exhaust fan. Close
fireplace dampers.
4. Follow the lighting instructions. Place the
equipment being inspected in operation. Adjust
thermostat so that the equipment will operate
continuously.
5. For any equipment having a draft hood, test for
draft hood equipment spillage at the draft hood
relief opening after five minutes of main burner
operation. Use the flame of a match or candle.
Model UHD[T][M][X][S][R] 150 - 400
# of Elbows
30 ft (9.1 m)
1
25 ft (7.6 m)
2
20 ft (6.1 m)
3
15 ft (4.5 m)
4
10 ft (3.0 m)
5
Summary of Contents for UHD 150 series
Page 2: ......
Page 4: ......
Page 8: ......
Page 27: ...SECTION 9 GAS PIPING 19 of 55 Figure 13 Gas Connection ...
Page 47: ...SECTION 14 TROUBLESHOOTING 39 of 55 14 1 General ...
Page 62: ...UHD STANDARD DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 54 of 55 ...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......