3. Install and Operating
3. Install and Operating
1.Installation
1) Connecting a Air-Pressure Line
- Straightly insert the tube into the air fitting until it gets installed inside.
-Pull the tube gently in order to make sure that it is safe.
2) Connecting Fluid Line
- The inlet of Fluid line fits in PT1/8” line.
3) Caution
①
When you cut the tube, make the severed side a right angled out and the use of a tube-cutter is
recommended.
②
Install the fluid line in oblique with the air line in order to minimize the intervention.
2. Operating
1) How to Use
①
Open the fluid line and air line of the valve.
②
Keep dispensing until the consistent drippings are made from the nozzle and stop dispensing.
2) Control of the deposit volume
Refer to the following directions so as to control the flow of liquid and the size of bubbles.
①
Adjust the pressure of fluid inlet of the valve.
②
Use the nozzles with different sizes in order to control the size of bubbles and to make fluid with
different viscosity.
③
For more precise controlling, adjust the stopper handle(No.12) of the valve. When it’s done, lock the
nut No.11.