background image

    5 

 
 
4. Installation & Operation 
 

 

4.1  Connecting Lines 

 

1) Connecting Air-pressure lines 

-

  Straightly insert the tube into the air 

fitting until it gets installed inside 

-

  Valve open line(A) is connected to the 

“open” port on the TAD-200V(controller). 

-

  Valve close line(B) is connected to the 

“air out” port on the TAD-
200V(controller). 

-

  Pull the tube gently in order to make 

sure that it is safe. 

2) Connecting Fluid Line 

-

  The inlet of Fluid line(C) fits in PT 1/8” 

line. 

3) Caution 

-

  When you cut the tube, make the 

severed side a right angled out and the 
use of a tube-cutter is recommended. 

-

  Install the fluid line in oblique with the air 

line in order to minimize the intervention. 
 

4.2    Operation 

 

1) Preparing to use 

-

  Open the fluid line and valve open air 

line(A) of the valve. 

-

  Keep dispensing until the consistent 

drippings in order to eleminates the air 
in the valve. 

-

  And then stop dispensing. 

2) Control of the dispensing volume 

-

  Adjust the pressure of fluid inlet. 

-

  Change the nozzle tip(D) to be 

compatible to preventing from air 
bubbles. 

 

Reviews: