5
4. Installation & Operation
4.1 Connecting Lines
1) Connecting Air-pressure lines
-
Straightly insert the tube into the air
fitting until it gets installed inside
-
Valve open line(A) is connected to the
“open” port on the TAD-200V(controller).
-
Valve close line(B) is connected to the
“air out” port on the TAD-
200V(controller).
-
Pull the tube gently in order to make
sure that it is safe.
2) Connecting Fluid Line
-
The inlet of Fluid line(C) fits in PT 1/8”
line.
3) Caution
-
When you cut the tube, make the
severed side a right angled out and the
use of a tube-cutter is recommended.
-
Install the fluid line in oblique with the air
line in order to minimize the intervention.
4.2 Operation
1) Preparing to use
-
Open the fluid line and valve open air
line(A) of the valve.
-
Keep dispensing until the consistent
drippings in order to eleminates the air
in the valve.
-
And then stop dispensing.
2) Control of the dispensing volume
-
Adjust the pressure of fluid inlet.
-
Change the nozzle tip(D) to be
compatible to preventing from air
bubbles.
A
B
C
D