BURNER CONNECTION TO THE BOILER
HEAD UNIT ASSEMBLY
•
Adjust the position of the coupling flange (19) by loosening the
screws (6) so that the burner head enters the furnace to the extent
recommended by the generator manufacturer.
•
Position the insulating gasket (13) on the sleeve, by inserting the
cord (2) between the flange and the gasket.
•
Anchor the flange of the head unit (15) to the boiler (1) with the stud
bolts, washers and nuts provided (7)
Use the specific chains or ropes connected to the respective eyebolts
and slots (21) of the burner.
CAUTION / WARNINGS
Make sure that the combustion head is long enough to enter the
furnace to the extent specified by the boiler manufacturer.
DANGER / ATTENTION
Seal the space between the burner sleeve and the hold on the
refractory material inside the boiler door completely with suitable
material.
ASSEMBLING THE GAS TRAIN
The gas train can be assembled 8, 8a 9 9a in different ways.
TBG 85 ÷ 260 MC / 260LX MC
(8) - (8a)
TBG 360 MC / LX MC
(9)
DANGER / ATTENTION
In case of very large valves, e.g. DN65 or DN80, make sure
there is a suitable support to prevent excessive stress on the
gas train fitting.
1
2
13
0002934720
19
7
6
13 / 38
0006160254_202106
ENGLISH