
ENGLISH
11 / 30
0006160096_201612
BURNER CONNECTION TO THE BOILER
ASSEMBLING THE HEAD UNIT
• Adjust the connection flange -19 position loosening the screws
-6. The burner head must penetrate to the extent requested by
the generator manufacturer.
• Position insulating seal -13 on the sleeve, placing rope -2
between the flange and the seal.
• Anchor the flange of the head unit -14 to the boiler -19 with the
stud bolts, washers and nuts provided -7.
CAUTION / WARNING
Completely seal the space between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.
ASSEMBLING THE GAS TRAIN
The gas train can be assembled in different ways: -8 and (8a).
Choose the most rational position for the set-up of the boiler room
and the position in which the gas pipe arrives.
Summary of Contents for TBG 35 MC
Page 2: ......
Page 31: ...ITALIANO 29 30 0006160096_201612 SCHEMI ELETTRICI YP ...
Page 61: ...ENGLISH 29 30 0006160096_201612 WIRING DIAGRAMS YP ...
Page 63: ......