ENGLISH
20 / 26
0006160036_201504
MAINTENANCE
Analyse combustion gases and check that the emission values
are correct at least once a year, in compliance with current law.
Carry out the following operations at the end of the heating season:
• Clean air dampers, the air pressure switch with pressure port
and the relevant pipe (if fitted).
• Check the electrode condition. Replace them, if necessary.
• Have the burner and the chimney cleaned by specialised
personnel (stove repairer); a clean burner is more efficient, lasts
longer and is quieter.
•
Check that the fuel filter is clean. Replace it, if necessary.
• Check that all components of the combustion head are in good
condition, have not been deformed and are free from deposits
deriving from the installation environment and/or from poor
combustion.
If it is necessary to clean the outside of the combustion head, take
out its components according to the procedure described:
Unscrew the fixing screw -10, unscrew the nut -9 from the joint -8,
open the ventilating body.
Pull out the ignition and ionisation cables -14 from their electrode
terminals -13; unscrew the screws (32).
Pull out the entire mixer unit -18 following the direction indicated
by the arrow.
To complete the maintenance work, re-fit the combustion head
following the sequence described above in the reverse order, after
you have checked that the ignition and ionisation electrodes are
correctly positioned.
13
10
14
0002938880
32
18
Summary of Contents for BGN 450 ME
Page 2: ......
Page 25: ...ITALIANO 23 26 0006160036_201504 SCHEMI ELETTRICI ...
Page 26: ...ITALIANO 24 26 0006160036_201504 ...
Page 27: ...ITALIANO 25 26 0006160036_201504 ...
Page 51: ...ENGLISH 23 26 0006160036_201504 WIRING DIAGRAMS ...
Page 52: ...ENGLISH 24 26 0006160036_201504 ...
Page 53: ...ENGLISH 25 26 0006160036_201504 ...
Page 55: ......