32
AL
remote alarm signalling
AR
main relay with “ar” contacts
AS
equipment fuse
BR
blocking relay with “ar” contacts
DW
outer pressure switch (tightness control)
EK... unblocking button
GP
outer pressure switch (for mains gas pressure)
HR
auxiliary relay with “ar” contacts
L1
equipment trouble signalling lamp
SK
line switch
I...XI programmer cam contacts
Control programme
t
4
5s
Putting control circuit under atmospheric pressure
t
6
7,5s
Time between start-up and energizing of main “
AR
” relay
t
1
22,5s
1st verification stage at atmospheric pressure
t
3
5s
Putting control circuit gas under pressure
t
2
27,5s
2nd verification stage at gas pressure
t
5
67,5s
Total time of tightness control, up to burner operation consent
t
20
22,5s
Return of programmer to rest position = fresh verification is enabled
Course of
programme
Terminals activated
by
equipment or by
electric
connections
LDU 11.. GAS VALVE
TIGHTNESS CONTROL EQUIPMENT
Summary of Contents for BGN 100 DSPGN
Page 6: ...6 BGN 40 DSPGN 100 DSPGN N 7604 2 Rev 02 02 96 BGN 120 DSPGN 350 DSPGN N 7605 5 Rev 17 11 97...
Page 19: ...19 AIR REGULATION PRINCIPLE DIAGRAM FOR GAS BURNERS BT 8769 1...
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......