4
Attach 4 PlasticTubes[15-1/4”]
(P-5) to the Top Shelf (P-1) as
shown in illustration #2a.
Illustration # 2a
4.)
7.)
Attach 2 Locking Casters (D)
to the front, and 2 Casters (E)
to the back of the unit.
Attach Middle Shelf (P-2) to the
4 Plastic Tubes [15-3/4”] (P-5) .
Attach 4 PlasticTubes
[17-1/2”] (P-4) to the Middle
Shelf (P-2) as shown in
illustration #2a.
P-2
F
P-1
P-5
P-5
P-4
P-8
Attach Bottom Shelf (P-3)
to the 4 Plastic Tubes
[17-1/2”] (P-4) as shown
in illustration #2a.
All Service Cart 42” Assembly
Attach Plastic Grommet
Cap ( F) to the Top Shelf
(P-1) as shown in
illustration #2a.
P-4
P-4
P-3
P-7
B
D
B
D
E
5.)
6.)
8.)
9.)
10.)
Attach Left and Right
Cordwinders (P-7 & P-8)
to the Top Shelf (P-1)
using 2 Hex Nuts (B) as
shown in illustration #2a.