First steps
Three simple steps are required to initially start up and configure the Balluff SmartVision Controller. Besides the Balluff
SmartVision Controller, the following is required:
•
24 V power supply with cold-device cable
•
LAN cable
•
Optionally: Industrial camera with suitable accessories
Step 1: Establishing a network connection with the Balluff SmartVision Controller
Connect the Balluff SmartVision Controller via the Gigabit Ethernet (LAN) port 1 with the network. The Balluff
SmartVision Controller is set to get the IP address from a DHCP server automatically
Step 2: Switching on the Balluff SmartVision Controller
WARNING
The Balluff SmartVision Controller and accessories must be supplied by Limited Power
Source (LPS) according to UL/IEC 60950-1 or Class 2 source according to UL 1310.
Connect the power supply via DC-In.
4.2.1
Connecting the DC power supply (19 to 28 V) via terminal clamp
Before connecting the power supply:
ATTENTION
It is not allowed to unplug or remove the input wires and wire clips of this model. The dis-
connection from the power supply should be made at the end of the supplied input wires.
ATTENTION
It is only allowed to connect the device to a DC 19 to 28 V electricity grid, which complies
with the requirements of a secure low voltage (SELV). The cable sizing must comply with
the short circuit current of the 19 to 28 VDC power supply, so that a short-circuit leads to no
damage caused by the cable. Only use cables with a core diameter of at least 1 mm².