2-2 Receiving & Installation
MN1272
4.
Apply Thick gasket: (Figure 2-1 and Figure 2-2). The gasket should
be applied on the operator panel just behind the bezel. The gasket
should be applied starting from the 1/3 of the lower side being careful to
keep it straight. The two ends of the gasket should meet without
overlap.
Note: Each time the panel is removed, the gasket should be replaced.
Figure 2-2 Mounting the Panel
Cutout
HMI Panel
Thick
Gasket
Thin
Gasket
5.
Secure the panel to the enclosure using the mounting hardware provided
Finger tighten each clamp until all clamps are installed. See Figure 2-3.
Figure 2-3 Panel Hardware
Enclosure
Surface
Recessed
Area
View from
Inside Enclosure
Recessed
Area
ÉÉÉÉÉ
ÉÉÉÉÉ
ÉÉÉÉÉ
Ç
Ç
Ç
Panel
Recessed
Area
Gaskets
Enclosure
Plastic Shoe
Machine Screw
Clamp
6.
Carefully tighten each clamp until the gaskets are slightly compressed.
Do not overtighten (do not flatten the gaskets).