Bugbox
UM-16 R5.0
Page 30 of 48
Bugbox User Manual
Figure 19: SPES with external hinged flap opened
Push materials through the SPES internal flap into the workstation chamber. This should be
done as quickly as possible to minimise gas loss from the workstation chamber.
When all materials have been added, lift the SPES external flap back to its closed position.
Whilst holding the SPES external flap, swing the thumb screw right to slot into the SPES
external flap.
Tighten the thumb screw.
Note: Do not over tighten the thumb screw. Note also that it may be easier to have your right hand in
the left hand Ezee Sleeve if loading multiple items.