background image

BAK Thermoplastic Welding Technology AG 

ADJUSTING THE HOT WEDGE 

The hot wedge can be adjusted depending on the material thickness. 

By cold wedge, engage the welding machine onto the geomembrane to be welded.

Engage the wedge onto the geombembrane.

Lower the pressure lever after the needed pressure has been adjusted.

Remove the lower part of the chain housing.

Loosen the hexagon cap screw which is inside the chain housing.

Loosen the hexagon cap screw of the rear roller guide.

Adjust the rear roller guide to the correct height. The distance between the rear roller guide
and the wedge should be the same like the thickness of material to be welded.

Tighten the hexagon cap screw of the rear roller guide.

Loosen the adjustment screw of the wedge. The wedge equalizes automatically to the thick-
ness of the material to be welded.

Tighten the adjustment screw of the hot wedge.

Adjust the front guide roller to the correct height. The distance between the inserted material
and the front guide roller should be approx. 1mm.

Tighten  the  hexagon  cap  screw  in  the  chain  housing  keeping  blocked  the  correspondent
screw of guide roller.

Assemble chain guard lower part.

Unhook the pressure lever and move the wedge back.

Check that all the screws are well tight and proceed with a welding test.

MAINTENANCE 

Clean the hot wedge with a wire brush (5201330) at the end of a working day.

Clean the drive/pressure rollers with a wire brush.

As required, treat the chain with a suitable spray.

After use, always check that the mains cable and plug are not damaged.

WARNING NOTICE 

If you are not using the machine for a longer period of time, switch of the heat. Otherwise, some 
parts can be heated up to more than 70°C. 

Never cool down the wedge with water, cooling spray, etc. 

Summary of Contents for Comon

Page 1: ...BAK Thermoplastic Welding Technology AG 1 OPERATING MANUAL...

Page 2: ...ren or people with limited physically sensory or mental ability Children must be supervised to pre vent that they play with the tool Protect the device from damp and wet WARRANTY AND LIABILTY Warranty...

Page 3: ...re rollers The equalisation of the pressure to both welded sections L1 and L2 as well as on a welded seam without test channel is guaranteed by the swivel head This allows T joints to be welded withou...

Page 4: ...front panel the motor can be switched on and off by the switch near the potentiometer The speed shown on the display corresponds to the ac tual welding speed Welding pressure Engage and position the w...

Page 5: ...ge no 4 Wait until the wedge has reached the adjusted temperature Guide and position the welding machine onto the overlapped geomembrane liner or film Switch on the drive motor with the foreseen switc...

Page 6: ...tically to the thick ness of the material to be welded Tighten the adjustment screw of the hot wedge Adjust the front guide roller to the correct height The distance between the inserted material and...

Page 7: ...found in our brochures SERVICE AND REPAIR Repairs should only be carried out by authorized BAK service centres These guarantee a profes sional and reliable 24 hour repair service with original spare...

Page 8: ...mage resulting from improper storage no warranty claim will be honoured DISPOSAL Power tools accessories and packaging should be sorted for environ mental friendly recycling Do not dispose power tools...

Reviews: