42
NOKORI - installation
NOKORI
®
BATH
INSTALLATION INSTRUCTIONS
1 800 463.2187
Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved. 45200618
Measure
& Align (2x)
TURBINE FACTORY INSTALLED
WIRING
UNDER
FLOOR
&
NO ACCESS
UNDER BATH
FOR NEXT STEPS FOLLOW THE INSTRUCTIONS:
TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH
2
AIR VENT OPENING ...................................................................................................................................34
3
ELECTRICAL WIRING OF TURBINE AND GEYSAIR
®
(THERMOMASSEUR
®
) .......................................................36
4
ELECTRONIC CONTROL INSTALLATION – MIAPLUS
®
& MIAMULTI
®
(OPTIONAL) .............................................37
4
ELECTRONIC CONTROL INSTALLATION – DOT .............................................................................................37
5
TURBINE FACTORY INSTALLED – ELECTRICAL CONNECTIONS (THERMOMASSEUR
®
) ......................................38
ELECTRICAL DIAGRAM – THERMOMASSEUR ................................................................................................17
ELECTRICAL DIAGRAM – THERAPIES ...........................................................................................................18
6
BATH INSTALLATION
HELPFUL TIPS:
• Carefully place the tub on its side,
on a blanket or a corrugated cardboard.
• To easily manipulate the bathtub
in a safe way during installation,
we recommend using moving straps.
WARNINGS
• Be sure the floor is leveled. Use shims as needed.
• Do not remove the protective plastic film on the tub and place a drop-cloth in the tub during installation to protect the acrylic.
• The tub must be securely anchored to floor.
• Apply a bead of silicone around the perimeter of the bath once on the floor.