background image

32  

NOKORI - installation

NOKORI

® 

 BATH

INSTALLATION INSTRUCTIONS 

1 800 463.2187 

 

Monday to Thursday from 8 a.m. to 8 p.m.  (EST) . Friday from 8 a.m. to 5 p.m. (EST)  

Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved. 45200618

PARTS AND TOOLS REQUIRED 

TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH 

1

  

PLUMBING – FLOOR LAYOUT FOR PIPES AND ACCESS

DIMENSIONS (IN.)

A

B

C

D

E

F

NOKORI 5827

58’’

27’’

10’’

21’’

9

5/8

’’

2

1/4

’’

NOKORI 6331

63’’

31’’

10

1/2

’’

23’’

10’’

1

1/2

’’ 

NOKORI 6429

64’’

29’’

10’’

23’’

9

5/8

’’

2

1/4

’’

DIMENSIONS (IN.)

A

B

C

D

NOKORI 6935

69’’

35’’

10

1/4

’’

28’’

NOKORI 7131

70

1/2

’’

31’’

12

1/4

’’

24’’

Access zone  
for drain 

Access zone for drain 

Recommended zone for optional components

Recommended zone  
for optional components

NOTE:  Detailed plan is provided in the 

Documentation

 / 

Installation User Guides

 section of 

Nokori bath models 

 

on our Web site 

bainultra.com.

Summary of Contents for NOKORI

Page 1: ...NOKORI INSTALLATION INSTRUCTIONS IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER T O BE KEPT BY THE OWNER ...

Page 2: ...ENT IMPORTANT SAFETY INSTRUCTIONS 1 PARTS TOOLS 3 SITE PREPARATION 5 INSTALLATION REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH 6 PIPING WIRING UNDER FLOOR NO ACCESS UNDER BATH 19 PIPING WIRING ABOVE FLOOR NO ACCESS UNDER BATH 27 TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH 32 WIRING UNDER FLOOR NO ACCESS UNDER BATH 40 WIRING ABOVE FLOOR NO ACCESS UNDER BATH 44 BATH INSTALLED AGAINST 1 2 O...

Page 3: ...thermo massage bathtub equipped with a heater Use this unit only for its intended purposes or as described in this manual Use only accessories or devices recommended by the manufacturer Risk of hyperthermia and possible drowning Check and adjust water temperature before use Water temperature exceeding 100ºF 38ºC may be injurious to your health To reduce the risk of injury as with any other convent...

Page 4: ...ly for permanently connected units A green colored terminal or a wire connector marked g gr ground or grounding is provided within the terminal compartment not applicable if unit supplied with an electric plug To reduce the risk of electrocution connect this terminal or connector to the grounding terminal of your electric service or supply panel with conductor equivalent in size to the circuit con...

Page 5: ...ain 1 E Brass nut 2 F 4 in brass tailpiece 1 G Brass overflow to drain pipe 1 H Nylon flat seal with flange 1 I 1 1 2 in male threaded adaptor 1 J 1 1 2 overflow male to male connector 1 K Floor anchor 2 ISLAND TUB DRAIN ITD KIT Makes installation and servicing easier for removal of bath Allows you to connect the bath drain tailpiece to the plumbing pipe without need for tightening to seal once th...

Page 6: ...200618 PARTS TOOLS STANDARD PARTS THERMOMASSEUR DESCRIPTION QTY L Turbine 1 M MiaPlus Control 1 N 15 ft wire for control 1 M OPTIONAL PART THERMOMASSEUR 2 2 AIR VENT IS REQUIRED FOR THERMOMASSEUR BATH WHEN TURBINE IS MOUNTED ON BATH See pages 34 to 36 for installation instructions 48 in level Teflon tape Silicone Slip joint pliers Drill Jig saw with fine cut blade Measuring tape ABS PVC Glue MATER...

Page 7: ...BEDDING Before installing ensure that the floor underneath the bath can support 1500 lb 680 kg The bath may sit directly on the floor SERVICE ACCESS AND VENTILATION A service access is necessary Minimum dimensions are 22 in x 18 in 55 cm x 46 cm to properly reach all electrical components of the system An air vent is necessary Minimum dimensions are 2 in x 4 in 5 cm x 10 cm to ensure proper functi...

Page 8: ...R LAYOUT FOR PIPES AND ACCESS DIMENSIONS IN A B C D E F NOKORI 5827 58 27 10 21 95 8 21 4 NOKORI 6331 63 31 101 2 23 10 11 2 NOKORI 6429 64 29 10 23 95 8 21 4 DIMENSIONS IN A B C D NOKORI 6935 69 35 101 4 28 NOKORI 7131 701 2 31 121 4 24 Access zone for drain Access zone for drain Recommended zones for optional components Recommended zone for optional components NOTE Detailed plan is provided in t...

Page 9: ...R LAYOUT FOR PIPES AND ACCESS 1 PLUMBING HELPFUL TIP Carefully place the tub on its side on a blanket or a corrugated cardboard Measure Align 2x REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH NOTE Detailed plan is provided in the Documentation Installation User Guides section of Nokori bath models on our Web site bainultra com Access zone for drain Recommended zones for optional components DIME...

Page 10: ... position that varies with different bath models Flexible Overflow Piping Factory installed J I H C B E G E D F A STANDARD PARTS PLUMBING DESCRIPTION QTY A Plated drain clicker 1 B Rubber seal 1 C Brass drain shoe 1 D Nylon conic shaped seal for drain 1 E Brass nut 2 F 4 in brass tailpiece 1 G Brass overflow to drain pipe 1 H Nylon flat seal with flange 1 I 1 1 2 in male threaded adaptor 1 J 1 1 2...

Page 11: ...m Nokori collection cannot be drilled for faucet installation Faucets must be freestanding or wall mounted models Geysair component cannot be remote mounted It must stay at original position attached to bath Must never be unplugged 3 ELECTRICAL WIRING OF OPTIONAL COMPONENTS TURBINE REMOTE MOUNTING SEE STEP 7 page 14 TURBINE REMOTE of CONTROL MODULES SEE STEP 8 page 15 Geysair Hose and Back Flow Pr...

Page 12: ...the protective plastic film on the tub and place a drop cloth in the tub during installation to protect the acrylic The tub must be securely anchored to floor Apply a bead of silicone around the perimeter of the bath once on the floor 4 BATH INSTALLATION HELPFUL TIPS Carefully place the tub on its side on a blanket or a corrugated cardboard To easily manipulate the bathtub in a safe way during ins...

Page 13: ...tic film on the tub and place a drop cloth in the tub during installation to protect the acrylic The tub must be securely anchored to floor Apply a bead of silicone around the perimeter of the bath once on the floor REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH 11 4 Maximum 4 BATH INSTALLATION HELPFUL TIPS Carefully place the tub on its side on a blanket or a corrugated cardboard To easily man...

Page 14: ...m from watertight seal Secure to the wall with permanent waterproof sealant mold free clear silicone for bathrooms Secure temporarily with a tape for about 24 h TOOLS REQUIRED TOUCH PAD INSTALLATION TOUCH PAD INSTALLATION LOCATION Determine the most convenient location on the wall close to tub Peel off the protective film of sticker behind the control You can add a silicone bead to secure to the w...

Page 15: ...mance It can be under the floor in a closet or any other place that can hide the turbine and if needed optional modules Easy access must remain possible at all time and sufficient air ventilation is necessary for turbine A service access is necessary Minimum dimensions are 22 in x 18 in 55 cm x 46 cm to properly reach all electrical components of the system An air vent is necessary Minimum dimensi...

Page 16: ...uity must be tested between the bath grounding terminal and the bath power supply Failure to perform the grounding continuity test could result in serious personal injury 7 REMOTE MOUNTING OF TURBINE AIR PIPE THERMOMASSEUR 7 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS THERMOMASSEUR See page 17 for electrical diagram Junction box Canada GEYSAIR TO GFCI Outlet United States EXTENSION CORD If r...

Page 17: ...cted in accordance with all local provincial state and federal building electrical codes and regulation Connect electrical supply only after all low voltage wiring is properly installed on turbine If you did not follow this last step shut off and then restart your home s circuit breaker Turbine and air pipe should be clear of building materials and wiring A 2nd Heated Backrest B Chromatherapy LED ...

Page 18: ...tra Inc All rights reserved 45200618 PARTS AND TOOLS REQUIRED A WarmTouchShell B Chromatherapy LED C DOT WarmTouchShell D DOT Chromatherapy TO GFCI Outlet United States C A D B C DOT WarmTouchShell WTS D DOT Chromatherapy LED Junction box Canada 8 REMOTE MOUNTING OF OPTIONAL THERAPIES TUB ONLY ELECTRICAL CONNECTIONS See page 18 for electrical diagram REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BA...

Page 19: ...RI BATH INSTALLATION INSTRUCTIONS N OK OR I inst allat io n PARTS AND TOOLS REQUIRED 15A CIRCUIT 20A CIRCUIT NEUTRAL N L LOAD NEUTRAL N L LOA GROUND FAULT CIRCUIT INTERRUPTERS JUNCTION BOX TURBINE WITH GEYSAIR FOR MIAPLUS MIAMULTI TURBINE WITHOUT GEYSAIR FOR MIAPLUS MIAMULTI N L N L ELECTRICAL DIAGRAM THERMOMASSEUR REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH ...

Page 20: ... a m to 5 p m EST Printed in Canada Copyright April 2017 BainUltra Inc All rights reserved 45200618 PARTS AND TOOLS REQUIRED 15A CIRCUIT AIRSTREME WARMTOUCHSHELL N L N L NEUTRAL N L LOAD INMIX MODULE CHROMATHERAPY GROUND FAULT CIRCUIT INTERRUPTERS JUNCTION BOX ELECTRICAL DIAGRAM THERAPIES REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH ...

Page 21: ...n 1 PLUMBING FLOOR LAYOUT FOR PIPES AND ACCESS DIMENSIONS IN A B C D NOKORI 5827 58 27 95 8 21 NOKORI 6331 63 31 10 23 NOKORI 6429 64 29 95 8 23 Opening for Island Tub Drain Recommended zone for optional components REMOTE MOUNTING OF TURBINE PIPING WIRING UNDER FLOOR NO ACCESS UNDER BATH DIMENSIONS IN A B C NOKORI 6935 69 35 28 NOKORI 7131 70 1 2 31 24 Opening for Island Tub Drain Recommended zone...

Page 22: ...H NOTE Detailed plan is provided in the Documentation Installation User Guides section of Nokori bath models on our Web site bainultra com WARNING Refer to supplied instructions for Island Tub Drain installation 1 PLUMBING HELPFUL TIP Carefully place the tub on its side on a blanket or a corrugated cardboard Measure Align 2x Island Tub Drain Opening for Island Tub Drain Recommended zones for optio...

Page 23: ...RNINGS If necessary adjust length of the flexible overflow piping connected to the overflow Adjust length on the straight part of the brass overflow pipe G to fit with the drain position that varies with different bath models Flexible Overflow Piping Factory installed J I H C B E G E D F A STANDARD PARTS PLUMBING DESCRIPTION QTY A Plated drain clicker 1 B Rubber seal 1 C Brass drain shoe 1 D Nylon...

Page 24: ...ori collection cannot be drilled for faucet installation Faucets must be freestanding or wall mounted models Geysair component cannot be remote mounted It must stay at original position attached to bath Must never be unplugged 3 ELECTRICAL WIRING OF OPTIONAL COMPONENTS TURBINE REMOTE MOUNTING See Step 7 page 14 TURBINE REMOTE of CONTROL MODULES See Step 8 page 15 Geysair Hose and Back Flow Prevent...

Page 25: ...rotective plastic film on the tub and place a drop cloth in the tub during installation to protect the acrylic The tub must be securely anchored to floor Apply a bead of silicone around the perimeter of the bath once on the floor 4 BATH INSTALLATION HELPFUL TIPS Carefully place the tub on its side on a blanket or a corrugated cardboard To easily manipulate the bathtub in a safe way during installa...

Page 26: ...WARNINGS Be sure the floor is leveled Use shims as needed Do not remove the protective plastic film on the tub and place a drop cloth in the tub during installation to protect the acrylic The tub must be securely anchored to floor Apply a bead of silicone around the perimeter of the bath once on the floor 4 BATH INSTALLATION HELPFUL TIPS Carefully place the tub on its side on a blanket or a corrug...

Page 27: ... INSTRUCTIONS N OK OR I inst allat io n PARTS AND TOOLS REQUIRED 4 BATH INSTALLATION DRAIN CONNECTION WITH ISLAND TUB DRAIN ITD INFORMATION WARNING Refer to supplied instructions for ISLAND TUB DRAIN installation ISLAND TUB DRAIN Floor surface REMOTE MOUNTING OF TURBINE PIPING WIRING UNDER FLOOR NO ACCESS UNDER BATH WARNING Use the 6 in 15 cm tail piece supplied with Island Tub Drain ...

Page 28: ...LLATION DOT 12 6 REMOTE MOUNTING OF TURBINE 13 7 REMOTE MOUNTING OF TURBINE AIR PIPE THERMOMASSEUR 14 7 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS THERMOMASSEUR 14 8 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS OF OPTIONAL THERAPIES 15 8 REMOTE MOUNTING OF OPTIONAL THERAPIES TUB ONLY ELECTRICAL CONNECTIONS 16 ELECTRICAL DIAGRAM THERMOMASSEUR 17 ELECTRICAL DIAGRAM THERAPIES 18 FOR NEXT ...

Page 29: ...FLOOR 1 PLUMBING FLOOR LAYOUT FOR PIPES AND ACCESS 19 1 PLUMBING 20 2 TURBINE GEYSAIR INSTALLATION FOR THERMOMASSEUR 22 WARNING IF THE AIR PIPING CONNECTIONS AND POWER SUPPLY OF THERAPEUTIC OPTIONS HAVE TO BE AT FLOOR LEVEL YOU MUST MAKE AN OPENING ON ONE SIDE OF THE BATH AS CLOSE AS POSSIBLE TO TURBINE AND CONTROLS Drill Jig saw with fine cut blade Hole Saw TOOLS REQUIRED FOR NEXT STEPS SEE SECTI...

Page 30: ...AGE FOR THE AIR INLET PIPE AND ELECTRICAL WIRING OF OPTIONAL THERAPIES 2 0000 3 0000 3 0000 minimum 2 0000 minimum 1 5000 2 5000 2 2500 minimum 3 2500 minimum R0 2500 Ø0 5000 CUTTING AREA FOR AIR PIPE AND WIRES Air pipe GEYSAIR Electrical wiring optional therapies CUTTING AREA FOR AIR PIPE AND WIRES SERVICING ACCESS HATCH FOR PIPES AND ELECTRICAL WIRING CUTTING AREA FOR AIR PIPE AND WIRES FRONT VI...

Page 31: ...CCESS UNDER BATH Air pipe GEYSAIR Electrical wiring optional therapies LOCATION SHOWN AS AN EXAMPLE MAY DIFFER ACCORDING TO THE POSITION OF REMOTE COMPONENTS AND LOCATION OF BATH SEE PAGE 21 FOR INSTALLATION OF ISLAND TUB DRAIN ITD HELPFUL TIP To easily manipulate the bathtub in a safe way during installation we recommend using moving straps WARNINGS Do not remove the protective plastic film on th...

Page 32: ...LATION OF ISLAND TUB DRAIN ITD HELPFUL TIP To easily manipulate the bathtub in a safe way during installation we recommend using moving straps WARNINGS Do not remove the protective plastic film on the bathtub and place a drop cloth in the bath during installation to protect the acrylic The bath must be securely anchored to floor Apply a bead of silicone around the perimeter of the bath once on the...

Page 33: ...THERAPIES 12 6 REMOTE MOUNTING OF TURBINE 13 7 REMOTE MOUNTING OF TURBINE AIR PIPE THERMOMASSEUR 14 7 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS THERMOMASSEUR 14 8 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS OF OPTIONAL THERAPIES 15 8 REMOTE MOUNTING OF OPTIONAL THERAPIES TUB ONLY ELECTRICAL CONNECTIONS 16 ELECTRICAL DIAGRAM THERMOMASSEUR 17 ELECTRICAL DIAGRAM THERAPIES 18 FOR NEXT ST...

Page 34: ... PLUMBING FLOOR LAYOUT FOR PIPES AND ACCESS DIMENSIONS IN A B C D E F NOKORI 5827 58 27 10 21 95 8 21 4 NOKORI 6331 63 31 101 2 23 10 11 2 NOKORI 6429 64 29 10 23 95 8 21 4 DIMENSIONS IN A B C D NOKORI 6935 69 35 101 4 28 NOKORI 7131 701 2 31 121 4 24 Access zone for drain Access zone for drain Recommended zone for optional components Recommended zone for optional components NOTE Detailed plan is ...

Page 35: ... adjust length of the flexible overflow piping connected to the overflow Adjust length on the straight part of the brass overflow pipe G to fit with the drain position that varies with different bath models Flexible Overflow Piping Factory installed J I H C B E G E D F A STANDARD PARTS PLUMBING DESCRIPTION QTY A Plated drain clicker 1 B Rubber seal 1 C Brass drain shoe 1 D Nylon conic shaped seal ...

Page 36: ...T OPENING See page 4 WARNING AN AIR VENT OF A MINIMUM OF 8 SQUARE INCHES IS REQUIRED TO HAVE AIR ENTRY AND GOOD VENTILATION FOR THE TURBINE SINCE THE TUR BINE IS MOUNTED ON THE BATH YOU MUST MAKE AN OPENING ON ONE SIDE OF THE BATH Silicone Drill Jig saw with fine cut blade TOOLS REQUIRED HELPFUL TIP IF INSTALLATION IS FOR TURBINE FACTORY INSTALLED WITH PIPING ABOVE FLOOR AND NO ACCESS UNDER BATH T...

Page 37: ...EQUIRED 2 AIR VENT OPENING CUTTING TEMPLATE OF WALL OF BATH OPENINGS POSSIBLE LOCATIONS 1 OPPOSITE SIDE OF BACKREST 2 LEFT HAND SIDE 3 RIGHT HAND SIDE 4 SIDE OF BACKREST WARNING A FULL SCALE CUTTING TEMPLATE IS AVAILABLE at PAGE 48 OF THIS MANUAL LOCATION 2 DETAIL LOCATION 3 INVERTED LOCATION 1 4 DETAIL 2 AIR VENT OPENING POSSIBLE LOCATIONS 1 4 2 3 ø 1 4 115 16 21 2 11 16 TURBINE FACTORY INSTALLED...

Page 38: ... bead of silicone all around the backside of the air vent 2 Place the air vent directly over opening on bath and apply pressure against the air vent to spread the silicone evenly 3 Adjust and level the air vent in place and secure temporarily with a tape for about 24h 1 2 3 STEPS TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH 3 ELECTRICAL WIRING OF TURBINE AND GEYSAIR THERMOMASSEUR WARNINGS Acce...

Page 39: ...through drilled holes Remove protective film from watertight seal Secure to the wall with permanent waterproof sealant mold free clear silicone for bathrooms Secure temporarily with a tape for about 24 h TOOLS REQUIRED TOUCH PAD INSTALLATION TOUCH PAD INSTALLATION LOCATION Determine the most convenient location on the wall close to tub Peel off the protective film of sticker behind the control You...

Page 40: ...ed States TO GFCI Outlet United States E D B C A Junction box Canada Junction box Canada Geysair WARNINGS Electrical outlet must be installed by a certified electrician Installation must be conducted in accordance with all local provincial state and federal building electrical codes and regulation Connect electrical supply only after all low voltage wiring is properly installed on turbine If you d...

Page 41: ... shims as needed Do not remove the protective plastic film on the tub and place a drop cloth in the tub during installation to protect the acrylic The tub must be securely anchored to floor Apply a bead of silicone around the perimeter of the bath once on the floor 6 BATH INSTALLATION HELPFUL TIPS Carefully place the tub on its side on a blanket or a corrugated cardboard To easily manipulate the b...

Page 42: ... NO ACCESS UNDER BATH 1 PLUMBING FLOOR LAYOUT FOR PIPES AND ACCESS DIMENSIONS IN A B C D NOKORI 5827 58 27 95 8 21 NOKORI 6331 63 31 10 23 NOKORI 6429 64 29 95 8 23 DIMENSIONS IN A B C NOKORI 6935 69 35 28 NOKORI 7131 70 1 2 31 24 Opening for Island Tub Drain Opening for Island Tub Drain Recommended zones for optional components Recommended zone for optional components NOTE Detailed plan is provid...

Page 43: ...RNINGS If necessary adjust length of the flexible overflow piping connected to the overflow Adjust length on the straight part of the brass overflow pipe G to fit with the drain position that varies with different bath models Flexible Overflow Piping Factory installed J I H C B E G E D F A STANDARD PARTS PLUMBING DESCRIPTION QTY A Plated drain clicker 1 B Rubber seal 1 C Brass drain shoe 1 D Nylon...

Page 44: ...ON MIAPLUS MIAMULTI OPTIONAL 37 4 ELECTRONIC CONTROL INSTALLATION DOT 37 5 TURBINE FACTORY INSTALLED ELECTRICAL CONNECTIONS THERMOMASSEUR 38 ELECTRICAL DIAGRAM THERMOMASSEUR 17 ELECTRICAL DIAGRAM THERAPIES 18 6 BATH INSTALLATION HELPFUL TIPS Carefully place the tub on its side on a blanket or a corrugated cardboard To easily manipulate the bathtub in a safe way during installation we recommend usi...

Page 45: ...er to supplied instructions for ISLAND TUB DRAIN installation ISLAND TUB DRAIN Floor surface WARNING Use the 6 in 15 cm tail piece supplied with Island Tub Drain WARNINGS Be sure the floor is leveled Use shims as needed Do not remove the protective plastic film on the tub and place a drop cloth in the tub during installation to protect the acrylic The tub must be securely anchored to floor Apply a...

Page 46: ...D ACCESS 40 1 PLUMBING 41 2 AIR VENT OPENING 34 3 ELECTRICAL WIRING OF TURBINE AND GEYSAIR THERMOMASSEUR TURBINE FACTORY INSTALLED WIRING ABOVE FLOOR NO ACCESS UNDER BATH WARNING IF THE POWER SUPPLY OF THERAPEUTIC OPTIONS MUST BE ABOVE THE FLOOR YOU MIGHT HAVE TO MAKE AN ADDITIONAL OPENING ON ONE SIDE OF THE BATH AS CLOSE AS POSSIBLE TO TURBINE AND CONTROLS Drill Jig saw with fine cut blade TOOLS ...

Page 47: ...MASSEUR PASSAGE FOR THE ELECTRICAL WIRING OF OPTIONAL THERAPIES 2 0000 3 0000 3 0000 minimum 2 0000 minimum 1 5000 2 5000 2 2500 minimum 3 2500 minimum R0 2500 Ø0 5000 CUTTING AREA FOR WIRES GEYSAIR Electrical wiring optional therapies CUTTING AREA FOR WIRES SERVICING ACCESS HATCH FOR PIPES AND ELECTRICAL WIRING CUTTING AREA FOR AIR PIPE AND WIRES FRONT VIEW END VIEW HOLE LOCATION MINIMUM DIMENSIO...

Page 48: ...AMULTI OPTIONAL 37 4 ELECTRONIC CONTROL INSTALLATION DOT 37 5 TURBINE MOUNTED ON BATH ELECTRICAL CONNECTIONS THERMOMASSEUR 38 ELECTRICAL DIAGRAM THERMOMASSEUR 17 ELECTRICAL DIAGRAM THERAPIES 18 6 BATH INSTALLATION 42 FOR NEXT STEPS FOLLOW THE INSTRUCTIONS TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH FOR NEXT STEPS FOLLOW THE INSTRUCTIONS TURBINE FACTORY INSTALLED WITH WIRING UNDER FLOOR AND NO...

Page 49: ...ave the perfect finish to the installa tion A tile flange not factory installed can be ordered with a Nokori bath INSTALLATION OF A TILE FLANGE INSTALLATION 1 Cut a 45 angle with the help of the miter box 2 Adjust the length at both ends and cut straight 3 Peel off the film of the double sided tape 4 Set the tile flange on the edge of bath and square against the wall 5 Apply a waterproof sealant a...

Page 50: ...0 R0 6 cm 5 591 14 2 cm Control cut out Trou du contrôle Control outline Contour du contrôle 2 165 5 5 cm AIR INTAKE OPENING PRISE D AIR OUVERTURE MIAPLUS MIAMULTI Trou pour infrarouge MiaMulti Cut out for MiaMulti infrared 11 313 28 7 cm 1 063 2 7 cm R0 125 R0 3 cm 0 813 2 1 cm 11 063 28 1 cm 1 625 4 1 cm 1 125 2 9 cm 1 375 3 5 cm 0 875 2 2 cm R0 125 R0 3 cm 1 625 0 04 4 1 cm 0 1 cm 5 125 0 04 13...

Reviews: