36
NOKORI - installation
NOKORI
®
BATH
INSTALLATION INSTRUCTIONS
1 800 463.2187
Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved. 45200618
PARTS AND TOOLS REQUIRED
2
AIR VENT OPENING – INSTALLATION
Geysair Hose and
Back Flow Preventer
Hot Water Supply
Geysair
Turbine
(ThermoMasseur
®
)
1
Apply a bead of silicone all
around the backside of the
air vent.
2
Place the air vent directly over
opening on bath and apply
pressure against the air vent
to spread the silicone evenly.
3
Adjust and level the air vent in
place and secure temporarily
with a tape for about 24h.
1
2
3
STEPS
TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH
3
ELECTRICAL WIRING OF TURBINE AND GEYSAIR
®
(THERMOMASSEUR
®
)
WARNINGS
• Access to Geysair
®
backflow preventer is necessary for cleaning of the filter.
• Geysair component cannot be remote mounted. It must stay at original position,
attached to bath. Must never be unplugged.