THERMOMASSEUR
®
|
geysair
tm
addendum to the owner’s manual
www.bainultra.com
Printed in Canada. Copyright © september 2012 Bainultra inc. all rights reserved. 45100169
some products, specifications, and services mentioned in this manual are described
in pending patent applications or are protected by patents.
T
H
E
R
M
O
M
A
S
S
E
U
R
®
13
essenCia oval 7236 - installation
2. installation
note
• to install the essencia oval 7236 on a concrete
slab with no access below for air entry to the
bath: a hole 1 5/8 inches (4.1 cm) in diameter
must be drilled from the inside to the outside into
the bath skirt to allow air supply to the bath.
for geysair equipped baths,
this hole will
also allow supply in hot water and electricity to
geysair. imPortant: do not drill above height of
existing hole in the skirt intended to connect drain
to overflow.
essencIa oval 7236
installation
10-1/2
12
90000056
CENTER LINE
OVERLAP THE DOTTED LINES
SUPERPOSER LES LIGNES POINTILLÉES
TUB BASE outline
CONTOUR DE LA BASE
CENTER LINE
LIGNE DE CENTRE
CENTER LINE
LIGNE DE CENTRE
LIGNE DE CENTRE
CENTER LINE
LIGNE DE CENTRE
TUB RIM
CONTOUR DU
BAIN
TUB DRAIN HOLE
DRAIN DU BAIN
OVERFLOW
DRAIN HOLE
TROU DU DRAIN DU TROP PLEIN
OPTIONS CABLE
CABLE D'OPTIONS
REMOTE AIR SUPPLY
ARRIVÉE D'AIR À DISTANCE
TEMPLATE Patron de découpe
Essencia Oval 7236
Dimensions +
_ 1/4” [+
_ 6mm]
1-1
2-1
2-3
2-6
2-2
1-1
2-1
2-3
2-6
2-2
1-1
2-1
2-3
2-6
2-2
1-1
2-1
2-3
2-6
2-2
2-1
assemble the drain on the bathtub. use the
flexible 1 1/2” pipe provided for the junction
between the overflow and the t-joint. ensure
watertightness. this operation is much easier
to complete when the bathtub rests on its
side. Place a cover or protective cardboard
on the floor before positioning the bathtub
on its side. •
for geysair-equipped baths,
connect the geysair electrical wire supplied
(orange label) to the turbine wire (also
marked with an orange label) in the junc-
tion box.
test for grounding continuity
between the bath grounding terminal
and the bath power supply.
failure to per-
form the grounding continuity test could
result in serious personal injury
2-2
apply a joint of silicone under the edge of
the base of the bathtub.
2-3
install the bathtub on the anchor points fas-
tened to the floor and immediately wipe away
any excess silicone. Connect the drain.
2-4
install the turbine according to the instructions
in the turBine – distanCe installation
section of the manual. the air inlet is located
to the left of the bathtub drain and, if applica-
ble, control and option connection cables to
the right. Connect control and option cables
if applicable.
2-5
fix the bath to the ground by screwing the
nuts on the anchors using a ratchet.
2-6
Peel and stick the seals to mask the opening.
• for geysair-equipped baths,
the geysair
unit must be connected to the hot water
supply with a 3/8 male compression or 1/2“
male nPt hose bibb.
a t and a valve (not
supplied)
must be installed at the hot water
intake.
once plumbing is fully installed and before beginning
any other work, fill the thermomasseur
®
to overflow
and wait 30 minutes. Check all plumbing hook-ups
and bath for leaks.
Bainultra
®
is not responsible for
any water damage caused by improper installation
(see warranty section)
.
leaK test
install turbine and inmix power module connections
according to specifications outlined in the
MiaMulti
®
electrical installation - turBine
section.
eleCtriCity
Summary of Contents for GEYSAIR
Page 2: ......