background image

THERMOMASSEUR

®

  | 

 

geysair

tm

 addendum to the owner’s manual

www.bainultra.com 

Printed in Canada. Copyright © september 2012 Bainultra inc. all rights reserved. 45100169
some products, specifications, and services mentioned in this manual are described  
in pending patent applications or are protected by patents.

 

T

H

E

R

M

O

M

A

S

S

E

U

R

®

 

     

13

essenCia oval 7236 - installation

2. installation

  

note

 

•  to install the essencia oval 7236 on a concrete 

slab with no access below for air entry to the 

bath: a hole 1 5/8 inches (4.1 cm) in diameter 

must be drilled from the inside to the outside into 

the bath skirt to allow air supply to the bath.  

for geysair equipped baths, 

this hole will 

also allow supply in hot water and electricity to 

geysair. imPortant: do not drill above height of 

existing hole in the skirt intended to connect drain 

to overflow.

essencIa oval 7236

installation

10-1/2

12

90000056

CENTER LINE

OVERLAP THE DOTTED LINES
SUPERPOSER LES LIGNES POINTILLÉES 

TUB BASE outline

CONTOUR DE LA BASE

CENTER LINE

LIGNE DE CENTRE

CENTER LINE

LIGNE DE CENTRE

LIGNE DE CENTRE

CENTER LINE
LIGNE DE CENTRE

TUB RIM

CONTOUR DU 

BAIN

TUB DRAIN HOLE 
DRAIN DU BAIN 

OVERFLOW

DRAIN HOLE
TROU DU DRAIN DU TROP PLEIN 

OPTIONS CABLE
CABLE D'OPTIONS

REMOTE AIR SUPPLY 
ARRIVÉE D'AIR À DISTANCE

TEMPLATE Patron de découpe

Essencia Oval 7236

Dimensions  + 

_ 1/4” [+ 

_ 6mm]

1-1

2-1

2-3

2-6

2-2

1-1

2-1

2-3

2-6

2-2

1-1

2-1

2-3

2-6

2-2

1-1

2-1

2-3

2-6

2-2

2-1

 

 assemble the drain on the bathtub. use the 

flexible 1 1/2” pipe provided for the junction 

between the overflow and the t-joint. ensure 

watertightness. this operation is much easier 

to complete when the bathtub rests on its 

side. Place a cover or protective cardboard  

on the floor before positioning the bathtub 
on its side. • 

for geysair-equipped baths,

 

connect the geysair electrical wire supplied 
(orange label) to the turbine wire (also 
marked with an orange label) in the junc-
tion box. 

test for grounding continuity 

between the bath grounding terminal

  

  

and the bath power supply. 

failure to per-

form the grounding continuity test could 
result in serious personal injury

2-2

 

 apply a joint of silicone under the edge of 
the base of the bathtub.

2-3

 

 install the bathtub on the anchor points fas-

tened to the floor and immediately wipe away 
any excess silicone. Connect the drain.

2-4

 

 install the turbine according to the instructions 

in the turBine – distanCe installation 

section of the manual. the air inlet is located 

to the left of the bathtub drain and, if applica-

ble, control and option connection cables to 

the right. Connect control and option cables 
if applicable.

2-5

 

 

fix the bath to the ground by screwing the 
nuts on the anchors using a ratchet.

2-6

 

 Peel and stick the seals to mask the opening. 

• for geysair-equipped baths,

 the geysair 

unit must be connected to the hot water 
supply with a 3/8 male compression or 1/2“ 
male nPt hose bibb. 

a t and a valve (not 

supplied)

 must be installed at the hot water 

intake.

once plumbing is fully installed and before beginning 

any other work, fill the thermomasseur

®

 to overflow 

and wait 30 minutes. Check all plumbing hook-ups 

and bath for leaks. 

Bainultra

®

 is not responsible for 

any water damage caused by improper installation 

(see warranty section)

.

leaK test  

install turbine and inmix power module connections 

according to specifications outlined in the 

MiaMulti

®

 

electrical installation - turBine

 section.

eleCtriCity  

Summary of Contents for GEYSAIR

Page 1: ...GEYSAIR TM ADDENDum to the owner s Manual Important information for the installer and the owner Included ThermoMasseur with Geysairtm installation important To be kept for the owner ...

Page 2: ......

Page 3: ...eestanding 5 amma freestanding 6 BALNEO Naos sanos Installation 7 8 BALNEO cella Installation 9 origami freestanding INSTALLATION 10 11 Essencia Oval 7236 parts and tools Installation 12 13 Essencia rectangular 6838 parts and tools Installation 14 15 TURBINE technical specifications 16 electrical installation plumbing 17 19 remote mounting 20 the MIA series controls Miaplus user guide 21 22 troubl...

Page 4: ...r cannot accidentally come in contact with electrical components turbine and power module For indoor use only electrical connections Never drop or insert objects into any openings The Thermomasseur must be connected only to a supply circuit that is protected by a 15 amp class a ground fault circuit interrupter GFCI for baths with 1 heated backrest and a 20 amp GFCI for baths with Geysair or for ba...

Page 5: ...gn template overflow drain hole with floor drain and make sure recess around drain matches required measurements 1 3 Mark anchor screw entry points on the floor 1 4 Remove template and screw anchors where specified TEMPLATE AYOURA Dimensions 1 4 6mm 12 20 1 1 1 2 2 3 ayoura freestanding installation 2 1 Unscrew both screws on access panel under the lip and gently remove panel 2 2 Complete installa...

Page 6: ...place installation template on floor in the chosen location 1 2 Align the template overflow with the floor drain and ensure that the recess around the drain is properly measured 1 3 Use a 3 16 bit to drill anchor screw entry points 2 1 Mount drain on bath Ensure watertightness 2 2 Position the bath aligning anchor holes with anchor screw entry points 2 3 Connect bath drain and water supply and com...

Page 7: ...de down on a blanket or corrugated cardboard ex the box in which it was delivered 1 3 On the floor determine by referring to measurements taken underneath the bath the exact location of the drain the air pipe and the two anchoring points at each end of the bath balneo NAOS SANOS installation 2 1 2 2 2 3 1 1 Horizontal Drain Horizontal Anchoring Point Vertical Drain Vertical Anchoring Point Vertica...

Page 8: ...E section leak test electricity BALNEO NAOS SANOS INSTALLATION NOTES Since these models sit directly on the floor the overflow drain pipe opening is factory drilled To installation of the Naos or Sanos on a concrete slab with no access below for air entry to the bath a hole of 1 5 8 inch 4 1 cm in diameter must be drilled into the bath skirt to allow air supply to the bath Important Do not drill a...

Page 9: ...s to be drilled for the drain and air intake for the turbine 1 2 Drill the four holes for the feet with a 3 16 drill bit and the drain and air intake openings with a 2 hole saw balneo CELLA installation Balneo series baths cannot be drilled for faucet installation Faucets must be freestanding or wall mounted models WARNING 2 1 Install the drain and overflow set on the bath and the first section of...

Page 10: ... cover or protective cardboard on the floor before positioning the bathtub on its side 2 2 Apply a joint of silicone under the edge of the base of the bathtub 2 3 Install the bathtub on the anchor points fastened to the floor and immediately wipe away any excess silicone Connect the drain 2 4 Install the turbine according to the instructions in the TURBINE DISTANCE INSTALLATION section of the manu...

Page 11: ...ub with a piece of wood placed behind the location to be drilled If a control or options are installed on the bathtub a second pipe may be required through which to feed the cables ORIGAMI FREESTANDINGDesign Series Installation 3 4 1 1 2 1 2 3 2 6 2 7 2 2 2 5 For Geysair equipped baths connect the Geysair electrical wire supplied orange label to the turbine wire also marked with an orange label in...

Page 12: ...mine a location near the bathtub at a maxi mum distance of 15 feet or 4 6 metres under the floor in a cabinet or any other location to conceal the turbine and optional accessory casings if applicable The location chosen must also be accessible and allow sufficient air intake for the turbine Refer to the TURBINE DISTANCE INSTAL LATION section B 1 48 inch level B 2 Caulking gun B 3 Screwdriver B 4 3...

Page 13: ...much easier to complete when the bathtub rests on its side Place a cover or protective cardboard on the floor before positioning the bathtub on its side For Geysair equipped baths connect the Geysair electrical wire supplied orange label to the turbine wire also marked with an orange label in the junc tion box Test for grounding continuity between the bath grounding terminal and the bath power sup...

Page 14: ...DED A 1 Floor anchoring A 2 Installation template B 2 B 1 B 3 A 1 x2 x1 A 2 Essencia rectangular 6838 freestanding site preparation Location INSTALLATION The Essencia 6838 requires a 10 x 12 25 cm X 30 cm compartment for the drain distance air inlet and space for control cables and options Refer to the installation template ACCESS AND AIR INLET For this model the turbine is not installed on the ba...

Page 15: ...pour chaque bain et les spécifications peuvent être modifiées suite à l amélioration du produit Les dimensions requises pour la préparation de l emplacement et pour la construction de la structure peuvent être différentes Aucune construction ne devrait être effectuée avant la réception du produit BainUltra n assume aucune responsabilité pour les travaux entrepris avant la réception du produit 1 1 ...

Page 16: ...d The dimensions needed for site preparation and structure building will differ BainUltra assumes no responsibility for preparatory work done prior to the product being on site warranty Turbine Geysair Some restrictions may apply www bainultra com warranty Air Intake Air Outlet Ground Wire for the Bathtub Hot Water Intake 4 3 4 12 1 cm 8 3 cm 19 7 cm 7 3 4 3 1 4 Flow Controller Filter Inside 72 27...

Page 17: ...ing terminal of your electric service or supply panel with conductor equivalent in size to the circuit conductors supplying the equipment and be 12 AWG or more install this unit in accordance with the canadian electrical code part 1 A service access is necessary Minimum dimensions are 22 x 18 55cm x 46cm to properly reach all electrical components of the system The InMix module Chromatherapy of th...

Page 18: ...ner s Manual MIAPLUS MIAMULTI Connections for double heated backrest of the Amma series with Geysair Electrical outlet must be installed by a certified electrician Installation must be conducted in accordance with all local provincial state and federal building electrical codes and regulations Connect electrical power supply only after all low voltage wiring is properly installed on turbine If you...

Page 19: ...scribed in pending patent applications or are protected by patents Supersedes page 29 of Owner s Manual 19 TURBINE WITH GEYSAiR electrical installation ELECTRICAL DIAGRAM TURBINE WITH GEYSAIR Electrical connections for Canada only 15A CIRCUIT 20A CIRCUIT AIRSTREME THERMOSEAT N L N L N L NEUTRAL N L LOAD NEUTRAL N L LOAD GROUND FAULT CIRCUIT INTERRUPTER JUNCTION BOX TURBINE WITH GEYSAIR FOR MIA MIA...

Page 20: ... electrical cable connecting the turbine to the Geysair unit This wire is marked with a yellow label B 1 Mount turbine to wall or wall structure by inserting 1 2 5 cm screws in mounting holes B 2 Use as many 1 1 2 4 cm ABS or PVC pipes as necessary to connect turbine to bath Follow all relocation instructions provided in installation manual To reduce vibrations avoid having air line pipes touch ho...

Page 21: ...ust backrest temperature Personalize session settings for up to 4 different users Personalize drying cycle for water jet conduits Lock controls when bath is not in use Adjust screen contrast Select display language Main functions Keys and functions Press this key to start or to stop the turbine and the MiaPlus control panel Press this key to return to function adjustment The Massage function appea...

Page 22: ...red intensity Bather 1 2 3 4 Stores each bather s selection Use the or keys to select an option Press to validate your choice Use the arrows or or the key to return to the basic Massage screen The MiaPlus control system lets you save up to four personalized presets This save function lets you conveniently preselect settings adapted to various users or purposes Simply set the functions and options ...

Page 23: ...The higher the speed the warmer the air is A simple way to check if your air heater or heaters are working properly is to turn on the system at the highest speed if your control offers a range of intensities with no water in the bath there is absolutely no risk to the system After 3 to 5 minutes the heated backrest or back rests should be warm to the touch and jets should also seem warm when you b...

Page 24: ...for a five 5 year period from the original purchase date For wooden parts of certain models and for MyBodyRestTM kit BainUltra Inc guarantees that in their original manufacturing form these parts are free of any manufacturing dimensional or strongly apparent natural defects for a one 1 year period from the original purchase date EXCLUSIONS The above stated limited warranty applies as long as damag...

Reviews: