INTRODUCTION

I-E96-407A   

2 - 1

SECTION 2 - INSTALLATION

INTRODUCTION

This section explains how to configure and install the NTAO01
Analog Output Termination Unit. Read, understand, and com-
plete the steps in the order they appear before using the termi-
nation unit.

SPECIAL HANDLING

Observe these steps when handling electronic circuitry:

NOTE: Always use Bailey's Field Static Kit (part number 1948385A1
- consisting of two wrist straps, ground cord assembly, alligator clip,
and static dissipative work surface) when working with the modules.
The kit grounds a technician and the static dissipative work surface
to the same ground point to prevent damage to the modules by elec-
trostatic discharge.

1.

Use Static Shielding Bag.

 Keep the modules in the static

shielding bag until you are ready to install them in the system.
Save the bag for future use.

2.

Ground Bag Before Opening.

 Before opening a bag con-

taining an assembly with CMOS devices, touch it to the equip-
ment housing or a ground to equalize charges.

3.

Avoid Touching Circuitry.

 Handle assemblies by the

edges; avoid touching the circuitry.

4.

Avoid Partial Connection of CMOS Device.

 Verify that all

devices connected to the modules are properly grounded before
using them.

5. Ground Test Equipment.

6.

Use an Antistatic Field Service Vacuum.

 Remove dust

from the module if necessary.

7.

Use a Grounded Wrist Strap.

 Connect the wrist strap to

the appropriate grounding plug on the power entry panel. The
grounding plug on the power entry panel is connected to the
earth grounding electrode system through the AC safety
ground.

8.

Do Not Use Lead Pencils to Set Dipswitches.

 To avoid

contamination of switch contacts that can result in unneces-
sary circuit board malfunction, do not use a lead pencil to set a
dipswitch.

Summary of Contents for Infi 90 NTAO01

Page 1: ...Process Control and Automation Solutions from Elsag Bailey Group E96 407 Analog Output Termination Unit NTAO01...

Page 2: ...UIPEMENTS LECTRONIQUES SONT SENSIBLES AUX PERTURBATIONS PAR FR QUENCE RADIO DES PR CAUTIONS DEVRONT TRE PRISES LORS DE L UTILISATION DU MAT RIEL DE COMMUNICATION PORTATIF LA PRUDENCE EXIGE QUE LES PR...

Page 3: ...modules The NTAO01 Analog Output Termination Unit provides an interface between the IMAOM01 Analog Output Module and eight analog outputs This product instruction explains how to install and use the...

Page 4: ...hrough 4 3 Original 5 1 Original A 1 through A 2 Original Index 1 Original When an update is received insert the latest changed pages and dispose of the super seded pages NOTE On an updated page the c...

Page 5: ...servicing Special Handling This module uses electrostatic sensitive devices SPECIFIC CAUTIONS It is strongly recommended that all power cabinet I O etc be turned off before doing any termination unit...

Page 6: ...e module contient des composantes sensibles aux decharges electro statiques ATTENTIONS D ORDRE SP CIFIQUE II est fortement recommand que toutes les alimentations armoire E S etc soient coup es avant d...

Page 7: ...INSTALLATION 2 2 Fuse Installation 2 2 Dipshunt Configuration 2 2 Installing the Termination Unit 2 4 Cabling Connections 2 5 Cable Installation 2 6 Power Wiring 2 6 Terminal Wiring 2 7 SECTION 3 MAI...

Page 8: ...le Connections 2 5 2 6 NTAO01 Terminal Assignments and Application Examples 2 7 A 1 Analog Output Module Layout A 1 List of Tables No Title Page 1 1 Reference Documents 1 2 1 2 Glossary of Terms and A...

Page 9: ...vice A field device may be system powered from the termina tion unit Figure 1 1 shows an example TAO application INTENDED USER System engineers and technicians should read this manual before installin...

Page 10: ...ibes precautions to observe when handling modules and setup procedures required before unit operation This section discusses dipshunt settings and installation procedures Maintenance Provides a mainte...

Page 11: ...s FTP Field termination panel A panel inside the INFI 90 cabinet on which to mount termina tion units INFI NET Advanced data communication highway Module Bus Peer to peer communication link used to tr...

Page 12: ...to 45 up to 70 C 158 F noncondensing Atmospheric Pressure Sea level to 3 km 1 86 mi Air Quality Bailey Controls equipment should be operated and stored in a noncorrosive environment Cooling Requiremen...

Page 13: ...dy to install them in the system Save the bag for future use 2 Ground Bag Before Opening Before opening a bag con taining an assembly with CMOS devices touch it to the equip ment housing or a ground t...

Page 14: ...wer for the AOM module Fuse F2 is a 3 0 amp 250 volt fuse Bailey Controls part number 1948776A13001 used for 24 VDC I O power for external devices Dipshunt Configuration The dipshunts select the analo...

Page 15: ...TB2 NTAO01 TB3 TB1 TERMINAL BLOCKS TB1 TB4 TERMINAL 1 TERMINAL 8 DIPSHUNTS XU1 XU4 CHASSIS GROUND 24 VDC COMMON DIPSHUNTS XU5 XU8 FUSES F1 F2 SOCKET P1 I1 I1 I1 I1 V1 V1 V1 V1 I1 I1 I1 I1 V1 V1 V1 V1...

Page 16: ...board to the field termi nation panel with two number ten self tapping screws Figure 2 2 NTAO01 Termination Unit Typical Current Output Circuit Figure 2 3 NTAO01 Termination Unit Typical Voltage Outp...

Page 17: ...ion unit supports the analog output module AOM Figure 2 5 shows the cable connection between the TAO termination unit and the AOM module The cable is either the NKTU01 or NKTU11 Termination Unit Cable...

Page 18: ...d latch securely in place Power Wiring There is one terminal E1 that connects to 24 VDC and one terminal E2 that connects to system common Figure 2 1 shows their locations on the TAO circuit board To...

Page 19: ...d 5 All field wiring is complete 6 Power is connected and applied to the termination unit Figure 2 6 NTAO01 Terminal Assignments and Application Examples 1 1 1 1 2 2 2 2 7 7 7 7 6 6 6 6 5 5 5 5 4 4 4...

Page 20: ...aintenance schedule MAINTENANCE SCHEDULE Execute the tasks in Table 3 1 at the specified intervals Table 3 1 Maintenance Schedule Task Interval Clean and tighten all power and field wiring connections...

Page 21: ...ROCEDURES If a TAO termination unit is faulty replace it with a new one Do not try to repair the unit replacing components may affect the performance and certification of the unit Table 4 1 Recommende...

Page 22: ...TB1 through TB4 2 Label and disconnect the cable connected to the termina tion unit at P1 3 Label and disconnect system 24 VDC I O power and sys tem common from the E1 and E2 terminals 4 Remove the 2...

Page 23: ...TERMINATION UNIT REPLACEMENT PROCEDURES I E96 407A 4 3 9 Connect the cable to the P1 connector 10 Verify all connections to the TAO termination unit 11 Energize the cabinet power supply that provides...

Page 24: ...and quantity 2 Model and serial numbers if applicable 3 Bailey Controls instruction manual number page number and reference figure that identifies the part Order parts without commercial descriptions...

Page 25: ...milliamps or zero to ten VDC for all eight outputs When jumper E3 is configured for zero to ten VDC all outputs must be configured for voltage outputs Table A 2 shows how to set the E3 jumper on the m...

Page 26: ...0 1 1 1 15 0 1 1 1 1 31 1 1 1 1 1 NOTE 0 CLOSED or ON 1 OPEN or OFF Table A 2 Settings for Jumper E3 Signal Jumper 4 to 20 mA 1 to 5 VDC 0 to 10 VDC Table A 3 Settings for Jumpers E6 through E13 Jumpe...

Page 27: ...module A 1 NTAO01 termination unit 2 3 M Maintenance schedule 3 1 Mounting diagram 2 5 N Nomenclature 1 3 O Output circuit Current 2 4 Voltage 2 4 Overview 1 1 R Reference documents 1 2 Replacement Fu...

Page 28: ...8756 ASIA PACIFIC 152 Beach Road Gateway East 20 04 Singapore 189721 Telephone 65 391 0800 Telefax 65 292 9011 EUROPE AFRICA MIDDLE EAST Via Puccini 2 16154 Genoa Italy Telephone 39 10 6582 943 Telefa...

Reviews: