INSTALLATION
UNPACKING AND INSPECTION
2 - 2
I-E96-435A
®
UNPACKING AND INSPECTION
These are steps to follow for general handling:
1. Examine the module to make sure that no damage has
occurred in transit.
2. Notify the nearest Bailey Controls sales office of any
damage.
3. File a claim for any damage with the shipping company
that handled the shipment.
4. Use the original packing material or container to store the
module.
5. Store the module in a place with clean air; free of extremes
of temperature and humidity.
SETUP/PHYSICAL INSTALLATION
This section explains how to configure and install the NIAI03.
The required procedures are installing the termination module
into the TMU, and connecting the field wiring and communica-
tion cables.
Cable Installation
The NKTU02/12 and NKTM01 cable connects the NIAI03 to the
IMASM03/04 slave module. Figure
shows the cabling for
the NIAI03 to the IMASM03/04. Table
cable applications.
Figure 2-1. Cable Connections for NIAI03
T00684A
IMASM03/04
NKTM01
NKTU02/12
NIAI03
P3
P1
P2
P1
Table 2-1. NIAI03 Cable Applications
Nomenclature/
Description
Application
Connector
Maximum
Length
NKTU02 (PVC)
Connects TM to IMASM03/04
P1 on TM to MMU backplane
61 m (200 ft)
NKTU12 (non-PVC)
NKTM01 (ribbon)
Connects TM to IMASM03/04
P1 on TM to MMU backplane
30 m (100 ft)