![Baileigh Industrial MB-4X2 Operator'S Manual Download Page 27](http://html.mh-extra.com/html/baileigh-industrial/mb-4x2/mb-4x2_operators-manual_466951027.webp)
24
20.
The only setting left is the mandrel, using the selector switch select “Mandrel” and press
retract, now pressure die “Retract”, and finally clamp “Retract”, we now have to repeat the
mandrel extend, once extended turn the pump switch off and remove the material. The
mandrel setting is critical, so the body of the mandrel needs to protrude ¼-
½ “ “PAST” the
tangent line of the die, set this using a straight edge. (Fig. 9a&b) After successful bends
have been completed, the mandrel position could be documented from the back of the
mandrel body to a known spot on the machine, for ease of set up.
(Fig. 9a- Notice the marker line on the die, that is the tangent line.)
(Fig. 9b- Notice how the front of the mandrel body is about 1/
4“ past the tangent line.)
Summary of Contents for MB-4X2
Page 16: ...13 OVERALL DIMENSIONS ...
Page 17: ...14 ...
Page 18: ...15 ...
Page 19: ...16 ...
Page 34: ...31 HYDRAULIC SCHEMATIC ...
Page 36: ...33 ELECTRICAL SCHEMATIC ...
Page 37: ...34 ...
Page 38: ...35 ...
Page 40: ...37 CART ASSEMBLY ...
Page 41: ...38 MAIN FRAME ASSEMBLY ...
Page 42: ...39 SPINDLE STACK ASSEMBLY ...
Page 43: ...40 SWING ARM ASSEMBLY ...
Page 44: ...41 MODIFIED PRESSURE DIE ASSEMBLY ...
Page 45: ...42 STRUT BAR ASSEMBLY ...
Page 46: ...43 ENCODER ASSEMBLY ...
Page 47: ...44 MANDREL TABLE ASSEMBLY ...
Page 48: ...45 MANDREL EXTRACTION CYLINDER ASSEMBLY ...
Page 49: ...46 CONTROL BOX ASSEMBLY ...
Page 56: ...53 ORIGINAL PRESSURE DIE PARTS DIAGRAM ...
Page 58: ...55 NOTES ...
Page 59: ...56 NOTES ...