![Baileigh Industrial MB-4X2 Operator'S Manual Download Page 20](http://html.mh-extra.com/html/baileigh-industrial/mb-4x2/mb-4x2_operators-manual_466951020.webp)
17
UNPACKING & CHECKING CONTENTS
1. Separate all contents from packing material; separate the machine and table from skids.
2. Move the machine and table to the desired area. Make sure area has plenty of work area
around the machine with ample lighting.
3. Check over parts carefully to ensure all parts are accounted for and undamaged.
4. Your machine is tested by our technicians before leaving our factory.
5. Inspect your machine again after it is operational. Please notify us if something is missing or
if damaged has occurred.
DIE STRUT ROD
CLAMP DIE
BEND DIE
WIPER DIE
PRESSURE DIE ASSEMBLY
PRESSURE DIE TOOLING
MANDREL ROD
PRESSSURE DIE ASSIST MANIFOLD
Summary of Contents for MB-4X2
Page 16: ...13 OVERALL DIMENSIONS ...
Page 17: ...14 ...
Page 18: ...15 ...
Page 19: ...16 ...
Page 34: ...31 HYDRAULIC SCHEMATIC ...
Page 36: ...33 ELECTRICAL SCHEMATIC ...
Page 37: ...34 ...
Page 38: ...35 ...
Page 40: ...37 CART ASSEMBLY ...
Page 41: ...38 MAIN FRAME ASSEMBLY ...
Page 42: ...39 SPINDLE STACK ASSEMBLY ...
Page 43: ...40 SWING ARM ASSEMBLY ...
Page 44: ...41 MODIFIED PRESSURE DIE ASSEMBLY ...
Page 45: ...42 STRUT BAR ASSEMBLY ...
Page 46: ...43 ENCODER ASSEMBLY ...
Page 47: ...44 MANDREL TABLE ASSEMBLY ...
Page 48: ...45 MANDREL EXTRACTION CYLINDER ASSEMBLY ...
Page 49: ...46 CONTROL BOX ASSEMBLY ...
Page 56: ...53 ORIGINAL PRESSURE DIE PARTS DIAGRAM ...
Page 58: ...55 NOTES ...
Page 59: ...56 NOTES ...