24
Figure 3-13: Connecting Cables and Grounding Screws
Before installing the eNB at its final destination, perform the steps in
section 3.6
section 3.7
Upon successful testing, the eNB will be ready for installation at the cell site. Seal and weatherproof
all the connection points, and rustproof where needed.
3.5 Maintenance Chamber Waterproofing
Once the installation is complete, you must close the maintenance chamber of the equipment and
waterproof the chamber.
Put the Ethernet cable on the wire, and seal the wire diameter 7 mm
±
1 mm.
3.6 Power on to Check LED Status
WARNING:
Ensure the antenna is connected before powering up the eNB. The wireless
signal transmission power can cause bodily injury and damage to the eNB and RF power
amplifier devices.
After the Nova430e is powered on, check that the LED indicators are lighting as expected: Power
is steady green, cell activated is slow flash green, and there are no alarms (Figure 3-14) per