14
Match the female connector at the display with the male connector at the
EB-BUS as shown in the picture above.
H. female connector at the
display
h. male connector at the EB-
BUS
2.5
Battery Slideway Installation
Align the mounting holes of the carrier with the mounting holes of the
battery slideway. Fasten the battery slideway onto the battery carrier with
hexagon socket head screws (M5).
Tightening torque: 2N.m
A.
hexagon socket head cap
screw (M5)
Tool:
Summary of Contents for DP C01.RS2 32.7
Page 9: ...9...
Page 50: ...50 Fault Alert Interface...