Table of contents
04/2019
EN
5
6.2
Decommissioning .................................................................... 28
6.2.1
Pump/unit remains assembled ............................................ 28
6.2.2
Pump/unit is dissembled and stored .................................... 28
7
Faults .............................................................................................. 29
7.1
Overview ................................................................................. 29
8
Maintenance ................................................................................... 34
8.1
Maintenance during operation ................................................. 34
8.2
Maintenance work ................................................................... 34
8.2.1
Cleaning the BADU Block Multi strainer basket ................... 35
8.2.2
Cleaning the BADU Block Multi acrylic lid ........................... 35
8.3
Draining/Cleaning .................................................................... 36
8.4
Disassembling of the pump/unit .............................................. 36
8.4.1
Preparation .......................................................................... 36
8.4.2
Dismantling pump/unit ......................................................... 36
8.4.3
Dismantling the motor ......................................................... 37
8.4.4
Dismantling motor unit ......................................................... 37
8.4.5
Dismantling pump housing .................................................. 37
8.4.6
Dismantling the impeller and mechanical seal ..................... 38
8.5
Assembling pump/unit ............................................................. 38
8.5.1
Pre-requisites ...................................................................... 38
8.5.2
Assembling meachanical seal ............................................. 39
8.5.3
Assembling impeller ............................................................ 39
8.5.4
Assembling motor unit ......................................................... 39
8.5.5
Assembling motor................................................................ 40
8.6
Screw torque ........................................................................... 41
8.7
Spare parts ............................................................................. 42
8.8
Warranty ................................................................................. 42
9
Disposal .......................................................................................... 43
10
Technical data ............................................................................ 44
10.1
Dimensional drawing ............................................................... 44
10.2
Characteristics ........................................................................ 52
10.3
Exploded drawing .................................................................... 54
11
Index............................................................................................ 56
Summary of Contents for Normblock Multi 100/250
Page 3: ...DE DE Originalbetriebsanleitung Normblock Multi Block Multi VW61 21 030...
Page 21: ...Transport und Zwischenlagerung 04 2019 DE 19 VW61 21 027 Abb 3 VW61 21 029 Abb 4...
Page 51: ...Technische Daten 04 2019 DE 49 BADU Block Multi Abb 12...
Page 55: ...Technische Daten 04 2019 DE 53 10 2 Kennfeld Abb 13...
Page 56: ...Technische Daten 54 DE 04 2019 Abb 14...
Page 57: ...Technische Daten 04 2019 DE 55 10 3 Explosionszeichnung Abb 15 Abb 16...
Page 60: ......
Page 78: ...Transport and intermediate storage 18 EN 04 2019 VW61 21 027 Fig 3 VW61 21 029 Fig 4...
Page 108: ...Technical data 48 EN 04 2019 BADU Block Multi Fig 12...
Page 112: ...Technical data 52 EN 04 2019 10 2 Characteristics Fig 13...
Page 113: ...Technical data 04 2019 EN 53 Fig 14...
Page 114: ...Technical data 54 EN 04 2019 10 3 Exploded drawing Fig 15 Fig 16...
Page 136: ...Transport et stockage interm diaire 20 FR 04 2019 VW61 21 027 Fig 3 VW61 21 029 Fig 4...
Page 167: ...Donn es techniques 04 2019 FR 51 BADU Block Multi Fig 12...
Page 171: ...Donn es techniques 04 2019 FR 55 10 2 Courbe de d bits caract ristique Fig 13...
Page 172: ...Donn es techniques 56 FR 04 2019 Fig 14...
Page 173: ...Donn es techniques 04 2019 FR 57 10 3 Vue clat e Fig 15 Fig 16...
Page 176: ......
Page 195: ...Transport en tijdelijke opslag 04 2019 NL 19 VW61 21 027 Afb 3 VW61 21 029 Afb 4...
Page 225: ...Technische gegevens 04 2019 NL 49 BADU Block Multi Afb 12...
Page 229: ...Technische gegevens 04 2019 NL 53 10 2 Grafieken Afb 13...
Page 230: ...Technische gegevens 54 NL 04 2019 Afb 14...
Page 231: ...Technische gegevens 04 2019 NL 55 10 3 Explosietekening Afb 15 Afb 16...
Page 234: ......
Page 235: ...IT IT Traduzione del manuale d istruzioni originali Normblock Multi Block Multi VW61 21 030...
Page 253: ...Trasporto ed immagazzinamento temporaneo 04 2019 IT 19 VW61 21 027 Fig 3 VW61 21 029 Fig 4...
Page 283: ...Dati tecnici 04 2019 IT 49 BADU Block Multi Fig 12...
Page 287: ...Dati tecnici 04 2019 IT 53 10 2 Curva caratteristica Fig 13...
Page 288: ...Dati tecnici 54 IT 04 2019 Fig 14...
Page 289: ...Dati tecnici 04 2019 IT 55 10 3 Disegno esploso Fig 15 Fig 16...
Page 292: ......
Page 311: ...Transporte y almacenamiento intermedio 04 2019 ES 19 VW61 21 027 Fig 3 VW61 21 029 Fig 4...
Page 341: ...Datos t cnicos 04 2019 ES 49 BADU Block Multi Fig 12...
Page 345: ...Datos t cnicos 04 2019 ES 53 10 2 Curva de rendimiento Fig 13...
Page 346: ...Datos t cnicos 54 ES 04 2019 Fig 14...
Page 347: ...Datos t cnicos 04 2019 ES 55 10 3 Dibujo de despiece Fig 15 Fig 16...
Page 350: ......