The BADU Mat 6-way multiport valve is designed to be mounted
directly on the filter housing.
The BADU Mat R 41 has five Rp 1½ inner threads and/or Ø50
glue sockets. The BADU Mat R 51 has five Rp 2 inner threads.
Four housing designs are available for three various installation
positions. For the 3A design, all connections are open with two Rp
1½ or Rp 2 sealing plugs and an O-ring.
NOTICE
Only use Teflon sealing tape to seal the threads. Do not use too
much in ordert o avoid the connections splitting open.
Observe the curing time of at least 12 hours for the glued version!
2 Function
The pump has to be switched off before operating the
BADU Mat. The valve can be brought to the desired position by
pressing down and turning the lever.
If the filter is soiled to such an extent that the filtration flow is no
longer sufficient, proceed as follows:
1. Switch the pump off.
2. Turn the lever from the
FILTER
position to the
BACKWASH
position.
3. Switch the pump on.
4. Backwash sufficiently. Switch the pump off again. A sight
check can be performed via the inspection glass.
5. Press and turn the lever once more to select the
RINSE
position.
6. Run the pump briefly to rinse the filter medium through.
7. Switch the pump off.
8. Feed fresh water into the pump up to the initial level.
9. Set the BADU Mat back to the
FILTER
position and switch
the pump back on.
Summary of Contents for Mat R 41
Page 2: ...Inhaltsverzeichnis DE Originalbetriebsanleitung EN Translation of original operation manual ...
Page 9: ...Technische Daten 01 2019 DE 7 7 Technische Daten 7 1 Durchflusskennlinie Abb 1 ...
Page 10: ...Technische Daten 8 DE 01 2019 7 2 Maßzeichnung Abb 2 ...
Page 11: ...Technische Daten 01 2019 DE 9 Abb 3 ...
Page 12: ......
Page 19: ...Technical data 01 2019 EN 7 7 Technical data 7 1 Flow characteristics Fig 1 ...
Page 20: ...Technical data 8 EN 01 2019 7 2 Dimensional drawing Fig 2 ...
Page 21: ...Technical data 01 2019 EN 9 Fig 3 ...
Page 22: ......
Page 23: ......