![Backyard YardLine ASTON Assembly Manual Download Page 23](http://html1.mh-extra.com/html/backyard/yardline-aston/yardline-aston_assembly-manual_3342407023.webp)
23
DOOR
2" (5,1 cm)
3" (7,6 cm)
PARTS REQUIRED (TEMPORARY):
3" (7,6 cm)
DOOR
First, nail lower edge of panel to floor frame using 2" nails 6" apart.
Angle nail to hit floor frame
(Fig. A)
.
3
You have finished standing your FRONT WALL.
FINISH
5
Secure front wall bottom plates to floor using (8) 3" nails
(Fig. A)
.
4
x8
x4
x10
FRONT WALL INSTALLATION
DOOR
3" (7,6 cm)
Screws x4
BOA x2
3" Nails into bottom plate.
BEGIN
Stand front wall on floor.
Center front wall assembly on the 120" front floor dimension.
Use (2)
BOA
as temporary braces. Level wall and secure
BOA
with two 3" screws.
2
1
120"
(304
,8 c
m)
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. A
2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm)
x2
BOA