13
Assembly Instructions
Step 15
Screw in BOLT M6*12 (BB) - 2 PCS
halfway on the firebox (35) as
shown in
Fig. 5a.
Slide in the two screws in opening
(Fig. 5b)
to hold the firebox in
position. Using M6*12 (BB) - 9 PCS,
fasten the firebox in place and
tighten all screws.
Step 16
Align and place gas lid on top of the
body (left side). Place PIN ROLL (GG)
- 2 PCS though the hinges and secure
with COTTER PIN (FF) - 2 PCS.
Align and place charcoal lid on top of
the body (right side). Place PIN ROLL
(GG) - 2 PCS through the hinges and
secure with COTTER PIN (FF) - 2 PCS.
Summary of Contents for PRO
Page 5: ...5 Parts List ...
Page 28: ...28 ...