![background image](http://html1.mh-extra.com/html/backyard-products/wood-pavilion-12-x-12/wood-pavilion-12-x-12_assembly-manual_3344193054.webp)
6" OVERHANG
(PAST CENTER MARK)
STEP 25: SHINGLES (NOT INCLUDED)
INSTALL FIRST STARTER ROW UPSIDE DOWN AND COLOR UP. START WITH A 1" OVERHANG AT
•
THE BOTTOM OF ROOF PANEL (FLUSH TO DRIP EDGE) AND 6" OVERHANG AT THE CENTER
MARK. USE (4) NAILS PER SHINGLE. (FIG 3.1)
USING YOUR SHINGLE HOOKED BLADE CUT SHINGLES ALONG RIDGE LINE. (FIG. 3.2) BE
•
CAREFUL NOT TO CUT FELT, IF INSTALLED.
BAG #
HARDWARE
15110 3/4" ROOFING NAIL X 875
SEE SHINGLE MANUFACTURER FOR
NAIL PATTERN
MATERIALS REQUIRED
3-TAB SHINGLES
9 Bundles
OR
ARCHITECTURAL
SHINGLES
7 Bundles
SEE SHINGLE MANUFACTURER FOR
NAIL PATTERN
STEP 25: SHINGLES (NOT INCLUDED)
BAG #
HARDWARE
15110 3/4" ROOFING NAIL X 875
4
FLUSH TO
TH
5
1
ST
TH
2
RD
3
SHINGLE
ND
OVERLAPS RIDGE
FIG. 3.1
SHINGLE
CUT OFF
DRIP EDGE
FIG. 3.2
TABS UP
3/4" ROOFING NAILS
(PER MANUFACTURER)
CHALK LINE
(CENTER MARK)
KEEP CUT-OFF 3-TAB SHINGLES FOR RIDGE CAPS
ONLY USE
3-TAB SHINGLES FOR
STARTER ROWS.