
55
TOWER FRAME 2
T-NUTS
TOP
IMPORTANT!
Orient both parts 2329-W as
shown for T-nut installation.
Pay close attention to hole
locations!
T-Nut
x10
Install T-Nuts BEFORE
assembling Tower.
T-Nuts should be installed
toward the INSIDE of
tower legs (2329-W).
Eventual parts shown
for positioning only
(don’t install yet!).
After installing all T-nuts,
ÁLSHDFK:HQGRYHUHQG
lengthwise, as shown.
TOWER FRAME 2
ASSEMBLE
TOP
5-1/2" Hex Bolt x2
Lock Washer
Flat Washer
Pre-Installed T-Nuts downward!
T- Nut
3" Wood Screw x2
3-3/4" Hex Bolt x2
Lock Washer
Flat Washer
1124-ST
1117-ST
[[
1113-ST
Flush
Flush
2329-W
Board 1113-ST
will overhang
1-3/8" this side.
Board 1124-ST
will overhang
1-3/8" this side.
[[
x2
[[
2329-W
x2
[[