
TOWER FRAME 1
T-NUTS
TOP
After installing all T-nuts,
ÁLSHDFK:HQGRYHUHQG
lengthwise, as shown.
Eventual parts shown
for positioning only
(don’t install yet!).
IMPORTANT!
Orient both parts 2329-W as shown
for T-nut installation.
Pay close attention to hole locations!
T-Nut x10
Install T-Nuts BEFORE
assembling Tower.
T-Nuts should be installed
toward the INSIDE of
tower legs (2329-W).
TOWER FRAME 1
ASSEMBLE
TOP
3-3/4" Hex Bolt x2
Lock Washer
Flat Washer
T-Nut
Pre-Installed T-Nuts downward!
3" Wood Screw x2
T-Nut
Flush
Flush
5-1/2" Hex Bolt x2
Lock Washer
Flat Washer
[[
2336-ST
[[
1124-ST
[[
1117-ST
Board 1124-ST
will overhang
1-3/8" this side.
2329-W
x2
[[
2329-W
x2
[[