STEP 7
WORKING YOUR WAY LEFT TO RIGHT, ATTACH (2) K9-2 WALL BOARDS TO K4 FLOOR RAIL
AND L7 SCULPTURED RAIL USING (8) 1" WOOD SCREWS, AS SHOWN.
ATTACH (6) K9-1 WALL BOARDS TO K4 FLOOR RAIL USING (12) 1" WOOD SCREWS IN THE
BOTTOM SET OF HOLES, AS SHOWN.
ATTACH J1 WINDOW LEDGE TO (6) K9-1 WALL BOARDS PREVIOUSLY INSTALLED USING
(16) 1-1/2" WOOD SCREWS, AS SHOWN.
K9-2
K9-2
L7
J1
K9-1
K4
ATTACH (2) K9-2 WALL BOARDS TO K4 FLOOR RAIL AND L7 SCULPTURED RAIL USING (8)
1" WOOD SCREWS, AS SHOWN.
K9-2
J1
K9-1
SCREW PFH
8x1
(28)
K9-1 - WALL BOARD - W100713
3/8"x3 3/8"x15 3/4" (11x86x400)
(6)
K9-2 - WALL BOARD - W100712
3/8"x3 3/8"x30 1/4" (11x86x768)
(4)
J1 - WINDOW LEDGE - W100709
1"x2 3/8"x29 1/2" (24x60x750)
(1)
OU
TE
R
PROPER INSTALLATION
OF K-9 BOARDS.
K9-2
K9-2
PILOT DRILL
(SEE BELOW)
PILOT DRILL
(SEE BELOW)
INN
ER
SCREW PFH
8x1 1/2
(16)