Phase 2
Ǣǻrƻˤ
ǢǢrōDĵɳŗŷǻrʲ
ōˠˤ
ʹɮˣʺ
NJŷNħDŷNJ^
ōˠˣ
ʹɮˣʺ
NJŷNħDŷNJ^
ŗˣ
ʹɮˠʺ
NJŷNħDŷNJ^
ōˠˣ
ʹɮˣʺ
NJŷNħDŷNJ^
ōˠˤ
ʹɮˣʺ
NJŷNħDŷNJ^
ˢ˨˧
ʹɮˡˣʺ
ǻ˚ŗȕǻ˚ˠˀˣ˃
PREPARATION: INSTALL T-NUTS
CENTER LINE
ǢǢrōDĵɳǻÝƻʲ
IT CAN HELP TO SET ALL THE
BOARDS IN PLACE TO MAKE
SURE THEY MATCH THE
DIAGRAM PRIOR TO MOUNTING
THEM WITH THE PROVIDED
SCREWS.
THESE SHOULD LINE UP
WHEN PROPERLY ASSEMBLED.
ˡ˟˟
ʹɮ˥˧ʺ
ǢNNJrɟ˚ˠˠˀˡ˃
ōˠˢ
ʹɮ˧ʺ
NJŷNħDŷNJ^
ROCK BOARD - W4L12496
5/8"x3 3/8"x27 3/4" (16x86x706)
M13
(x8)
ROCK BOARD - W4L12498
5/8"x3 3/8"x27 3/4" (16x86x706)
M15
(x4)
ROCK BOARD - W4L12497
5/8"x3 3/8"x27 3/4" (16x86x706)
M14
(x4)
SCREW PFH BLK
8x1 1/2
(x68)
H100200
T-NUT BLK
1/4
(x24)
H100398
ROCK BOARD - W4L12499
5/8"x2 3/8"x27 3/4" (16x60x706)
N4
(x1)
NOTE EVENLY SPACE ALL GAPS.
USE THE FOLLOWING REPEATING PATTERN TO
BUILD THE ROCKWALL. BEGINNING AT THE TOP
THE PATTERN IS M13, M15, M13, M14. REPEAT 4
TIMES AND END WITH N4 BOARD. MAKE SURE TO
PLACE EACH M14 BOARD SO THE HOLES
ALTERNATE RIGHT TO LEFT OF CENTER.
71
Summary of Contents for 1902022B
Page 48: ...s r D D N r NOTE PILOT HOLE KNOB DR BRN x1 A6P00274 SCREW PFH BLK 8x1 3 4 x1 H100382 48...
Page 93: ...r Phase 6 D D r BOLT WH BLK 5 16x3 x2 H100416 NUT BARREL WH BLK 5 16x7 8 x2 H100192 93...
Page 99: ...Phase 7 r N r r r D SCREW PWH BLK 8x5 8 x4 H100202 STOVE ASSEMBLY FROM PREVIOUS STEP 99...