Phase 2
Ǣǻrƻ˦
ǢǢrōDĵɳǻÝƻʲ
INSTALL ROCKS USING THE
SHOWN HARDWARE WITH
THE T-NUTS THAT WERE
PRE-INSTALLED FROM STEP
5 OF THIS PHASE.
ˣ˦ˢ
ʹɮˡˣʺ
ɟǢËrNJ˚˧ɮˠˤ˃
ˣ˧˨
ʹɮˡˣʺ
Dŷĵǻ˚ˢˀˣ˃
˟ˢ˦
ʹɮˠˡʺ
µNJrrŗËNNJŷNħ˞ˡ
GREEN HC ROCK #2
(x12)
A6P00037
NOTE ARROW
SHOULD FACE UP.
WASHER LOCK INT BLK
8x15
(x24)
H100473
BOLT PTH BLK
1/4x3/4
(x24)
H100489
73
Summary of Contents for 1902022B
Page 48: ...s r D D N r NOTE PILOT HOLE KNOB DR BRN x1 A6P00274 SCREW PFH BLK 8x1 3 4 x1 H100382 48...
Page 93: ...r Phase 6 D D r BOLT WH BLK 5 16x3 x2 H100416 NUT BARREL WH BLK 5 16x7 8 x2 H100192 93...
Page 99: ...Phase 7 r N r r r D SCREW PWH BLK 8x5 8 x4 H100202 STOVE ASSEMBLY FROM PREVIOUS STEP 99...