10 FOOT SLIDE ASSEMBLY
STEP 4
●
ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND
SUPPORT POCKET, SECURE USING 2-1/2" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
●
REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH 8x3
(19 PLCS)
SCREW PFH 8x3
(19 PLCS)
SCREW PFH
8x3
(38)