
4X”- 6” Deringer 20/30 Maintenance Instructions
BD-INST-02030 | Rev C | 12/22/2015 | Copyright 2011 Backflow Direct, LLC
Removing the Second Dual-Action Check Module
1.
Use a 1 1/8
” Socket Wrench to loosen the Check Retainer Bolts on
each side of the valve body (A). Do not completely remove check
retainer bolts from valve body. Merely loosen the bolts until the
ends of the bolts are flush with the inner wall of the valve body(B).
2.
Insert a flathead screwdriver between the inner valve body and the
Second Check Module Flange (C), gently coax the Second Check
Module in the upstream direction until the Second Check Module
can easily be removed from the access port by hand.
A
A
C
BD-INST-4X2030 | Rev A | 09/06/2019 | Copyright 2011 Backflow Direct, LLC
Page 7 of 20
B
FLOW