
4X”- 6” Deringer 20/30 Maintenance Instructions
BD-INST-02030 | Rev C | 12/22/2015 | Copyright 2011 Backflow Direct, LLC
Close Test Cocks and Double Check all Closing/Sealing Mechanisms
1. Using the Backflow Direct Test Cock Wrench or a small
adjustable wrench close Main Test Cocks Number 1, 2
and 3 (A). (Test Cock is closed when wrench flats on
stem are perpendicular to water flow through Test Cock)
2. Using a #2 Flathead Screwdriver Close Bypass Test Cock
Number 1 and 2 (B). (Test Cock is closed when
screwdriver slot on stem is perpendicular to water flow
through Test Cock)
3.
Use the “T” handles to open bypass Ball Valve Number 1
(C) and then open bypass Ball Valve Number 2 (D). (Ball
Valve is open when “T” handle is parallel to water flow
through Ball Valve)
4. Double check to be certain of the following:
•
All Cover Bolts are Tightened (E)
•
Bypass Check Valve Cover is Tightened (F)
•
Bypass Meter Coupling Nuts are Tightened (G)
A
A
B
BD-INST-4X2030 | Rev A | 09/06/2019 | Copyright 2011 Backflow Direct, LLC
B
FLOW
Page 18 of 20
D
E
C
G
F