background image

 

3

 

 

 

V1.02 Revised 12/17/2020 

Safety

 

 

This section contains safety instructions that must be followed to ensure safe operation, 
loading/unloading, and maintenance of the equipment. Everyone operating the equipment 
must read and understand these precautions before operating the equipment. OSHA and state 
safety agency rules must be complied with in addition to those given in the safety section and 
elsewhere in this manual. Applicable plant general safety practices must also be followed.  

BACA Systems designed your Miter X with safety in mind. Throughout this manual, safety 
precautions and warnings are highlighted for specific operations. Safety precautions are also 
posted on the equipment.  

On-site safety and engineering personnel should develop and maintain proper work 
instructions for this machine which incorporate general and specific safety instructions as found 
in this manual.  

On-site safety and engineering personnel should develop and maintain proper lockout-tagout 
procedures for this equipment following applicable local requirements. If unsure of these 
requirements you should contact your state or federal OSHA representatives.  

Make a routine daily inspection of the entire machine before operating it. Visually check all 
parts of the machine for abnormal conditions. If any issue is noted report it immediately to your 
supervisor for immediate correction. 

  

   

   

   

 

Summary of Contents for Miter X

Page 1: ...1 V1 02 Revised 12 17 2020 BACA Miter X Miter machine Service Manual For internal service department only ...

Page 2: ...2 V1 02 Revised 12 17 2020 Contents Safety 3 Stage 1 5 Stage 2 5 InputOutput_Status 6 SawVFD_CyclicStatus 6 CarriageVFD_CyclicStatus 7 Stage 3 8 Stage 4 8 ...

Page 3: ...and warnings are highlighted for specific operations Safety precautions are also posted on the equipment On site safety and engineering personnel should develop and maintain proper work instructions for this machine which incorporate general and specific safety instructions as found in this manual On site safety and engineering personnel should develop and maintain proper lockout tagout procedures...

Page 4: ...sed after servicing Do NOT use jumper wires across fuses or fuse holders Repair any electrical issue properly before placing the equipment back into service Operators must wear protective equipment when working around the Miter X Operators must wear goggles or safety glasses to guard against spray and flying debris Operators and others exposed to noise levels above 90 dBA for more than 1 hour must...

Page 5: ...ervice stage you can ask customer to connect the ethernet switch to their laptop ask them to provide a team viewer id and password so we can access the PLC by using their computer web access Below is a step by step to access the PLC through the web access 1 Open Google chrome Type HTTPS 10 0 10 1 Press Advanced and press Proceed to 10 0 10 1 Figure 2 1 1 2 Once the page is loaded up press enter Fi...

Page 6: ...e Figure 2 2 1 Figure 2 2 1 SawVFD_CyclicStatus SawVFD_CyclicStatus page will show you the status of the saw VFD status This page will help you determine if the communication between PLC and saw VFD is valid and compare between the program action versus the physical action of the machine This page will show you real time value of actual speed current and torque of the saw This page will also show ...

Page 7: ...help you determine if the communication between PLC and carriage VFD is valid and compare between the program action versus the physical action of the machine This page will show you real time value of actual speed current and torque of the Carriage This page will also show yo real time fault and warning of the systems Figure 2 2 3 Figure 2 23 ...

Page 8: ...of the saw and carriage Please be aware and remind the customer that if this value is changed and is requested by the customer the warranty of the machine will be void This stage also gives another access for different watch tables called Debug EngineeringOnly Figure 2 3 1 Please contact engineering department if stage 3 is needed Figure 2 3 1 Stage 4 Stage 4 of service is for major issues in the ...

Reviews: