background image

 

 

 

SUBTERRA 

Page 4 

www.babcopark.ca 

Any work on electrical must be carried out by qualified personnel only. Ensure system is grounded with effective 

ground circuit. Electrical system adjustments must be made in accordance with what is featured on nameplate. 

Remove all material and personnel around the lift before switching the power on. 

5)

 

Now the lift needs to be raised to finish the installation process 

Follow the guidelines in Part 5 Operation to safely operate the lift for the first time. Clear obstacles around lift 

before operation. During lifting or lowering, no person is allowed to stand near the two sides or beneath the 

machine, and no person is allowed on the platform. 

Because this is the first time, you need to make sure that the phase of the current is connected correctly. For this, 

after having read the operations instruction (all clear area), push the “up” button for a short period only, making 

sure that the motor is running correctly. If this is the case, the connection is correct, and you may proceed. If this 

is not the case, rectify immediately or damage will occur. 

6)

 

Now you can install the side decks and upper-level deck. Raise the lift far enough, so you can place some 

support beams under the lift and over the pit, 1 in the front and one in the rear. Lower the lift just enough, so 

the deck is level just on top of the beams. The side decks can now be prepared with adhesive insulating 

material and slid into position and bolted tightly. Remove the support beams. 

Now install the columns for the second deck and install the second deck. 

Pay attention to the numbering of the columns and check the extra height of the lift, now with the second 

deck installed, when raising the lift. 

7)

 

Now, raise the lift to the floor level. For this, read the instructions in the maintenance section Part 6 

8)

 

After having secured the lift in the up position proceed with anchoring the lift in the pit with provided anchor 

bolts. 

9)

 

Adjustment of the limit switches. After installation, adjust the limit switches as required to ensure that the lift 

is at the correct height.  

10)

 

Adjustment of the bump stops. When the lift is in the down position, it should rest fully on the bump stops. 

Make sure that the bump stops are adjusted at an equal height from the base of the lift. 

If this is not done correctly, the lift deck will deform in the down position, and when lifting, damage will occur to 

the hydraulic system, since lifting will not be equally distributed to all 4 corners. 

11)

 

LOADING TEST 

DO NOT PLACE ANY VEHICLE ON THE LIFT BEFORE TEST OPERATION. RAISE THE LIFT UP AND DOWN SEVERAL 

TIMES TO ENSURE AIR IS EXHAUSTED FROM THE CYLINDERS. 

Test the lift before using. This step is very important to check if there is any leakage of a hydraulic line. Also make 

sure the base frame is anchored as well and does not move during operation. If there’s no abnormal noise or 

leakage after running two or three times, run with load. Never exceed the maximum capacity and height specified 

for the specific model. 

12)

 

Install the top platform (for the Subterra double deck lift) 

First: Install 4-post with bolt on lower platform, ensure 4 post is vertical 

Second: Install top platform. Due to the way the lift is transported -the upper platform will arrive in 2 halves in the 

middle. You will need to connect them with the bolts when you get it. Then connect the upper platform with the 

4-post with bolts and screws, Please note: top platform approx 1200KG, so you will generally need to hire one 

crane. 

Summary of Contents for SUBTERRA

Page 1: ...R MANUAL FOR INSTALLATION OPERATION AND MAINTENANCE OF SINGLE DOUBLE DECK CAR LIFTS Applicable Models SUBTERRA Read this entire manual carefully and completely before installation or operation of the lift ...

Page 2: ...SUBTERRA Page 2 www babcopark ca Table of Contents 1 INSTALLATION INSTRUCTIONS 3 2 OPERATION MANUAL 5 3 MAINTENANCE 6 ...

Page 3: ...talled attachment points During lifting and placement in the pit no person is allowed under or within falling distance of the lift During unloading operation lift must be handled as shown in the picture 1 2 Preparation before installation The thickness and leveling of the base concrete are essential The leveling adjustment ability of the lift itself cannot be relied upon for a perfect level To ins...

Page 4: ...lift now with the second deck installed when raising the lift 7 Now raise the lift to the floor level For this read the instructions in the maintenance section Part 6 8 After having secured the lift in the up position proceed with anchoring the lift in the pit with provided anchor bolts 9 Adjustment of the limit switches After installation adjust the limit switches as required to ensure that the l...

Page 5: ...e lift 4 Make sure that the vehicle is positioned correctly according to the parking position schematic in the technical section Switch off the engine of the vehicle put in gear if applicable and engage the parking brake Be sure to lift only approved vehicles never exceeding the specified weight and maximum height length and width as specified in the technical section 5 Ensure that sufficient ligh...

Page 6: ...ollows 1 Disconnect the power source 2 Empty the control unit tank 3 Grease all moving parts The manufacturer warranty is one year on parts If parts fail within the one year warranty replacement parts will be provided The manufacturer will not take any responsibility for improper installation and operation overload running normal mechanical abrasion and insufficient maintenance Several maintenance...

Page 7: ...ck the tightening of screws Check the hydraulic system seal and tighten the loose connectors if necessary Check the greasing and the wear condition of pins rollers bushings of structure as well as arms and relevant extensions if necessary replace the damaged parts by original spare parts 4 YEARLY MAINTENANCE Empty the tank and check the conditions of the hydraulic fluid Clear the oil filter 4 ELEC...

Reviews: