
2 Installation and Pre-Operation
2.1 Installation
To achieve a good performance the Centrifugal Juicer shall be installed on a steady
and flat surface about 850 mm above floor .
Check the voltage , be sure the network electric voltage is the same as the voltage
indicated on the data plate label . Grounding is mandatory , do it in accordance with
the local rules .
2.2 Pre-operation
Before using the machine wash it with running water all the Centrifugal Juicer parts
which might get into contact with the product .
Assembly
Place the Bowl (no. 03 Pic 1 ) on the Motor Support (no. 8 Pic 3 ) with the nose placed
between the two Support Lips( Pic. 04 ) . Turn the Clogging Pin Safety Plate ( no.18
Pic 5 ) upward and press the Central Shaft Clogging Pin (no. 19 Pic 5 ) against the
Central Shaft . Keep the Central Shaft Clogging Pin Pressured, fit the Sieve (no.07
Pic 2 ) on the Central Shaft and turn it clockwise until a snap is heard . Release the
Central Shaft Clogging Pin. Fit the Lid on the Bowl ( no.03 Pic 6 ) turning it
counterclockwise grabbing the liquid discharge nose until the two lid slits touch the
Handle beams ( no. 4 Pic 6 ) and then tight the handles .
Place the Cup ( no 16 Pic 1 ) below the Bowl nose( no.03 Pic 1 ) and install the
Residual Exit (no 15 Pic 7) on the Lid residuals exit throat ( no.03 Pic 7 ), or place the
Residual Collecting Vessel ( no. 17 Pic 1 ) below the exit throat ( see Pic 1 ) .
3
Ligação em 110V 60Hz
Saída
Entrada
Reed Switch
N
F
Contatora
M
1
5
3
4
8
2
2
4
14
6
A2
A1
5
13
3
1
Chave Liga/Desliga
Chave Liga/Desliga
M
Chave Seletora 110/220 Volts
1
3
13
5
A1
A2
6
14
4
2
1
5
4
8
3
2
M
Contatora
F
N
Reed Switch
Entrada
Saída
Ligação em 220V 50/60Hz
5.2 Electric Diagram
220V 50/60Hz (Mod. CSE)
110/220V 60Hz (Mod. CS)
110V 60Hz (Mod. CSE)
12
Summary of Contents for CS
Page 2: ......