6 Reporting Procedure
52
DHV0078 b2 EN
©
b2 electronic
GmbH
Step
Procedure
(Reporting)
Example
End of reporting
procedure
Select test mode
•
To continue in
manual test mode
: See 5.2
Steps MS1-MS5 – set test parameters
Steps MR1-MR6 – run test
•
To continue in
automatic test mode
: See 5.3
Steps AS1-AS15 – configure sequence
Steps AR1-AR9 – run test
Start a New Test
Use an existing
Auto Test Sequence
or use Manual Mode?
Auto Seq.
Manual
MAIN PREV
Summary of Contents for HVA34
Page 2: ...1 Introduction 2 DHV0078 b2 EN b2 electronic GmbH...
Page 11: ...2 Safety b2 electronic GmbH DHV0078 b2 EN 11...
Page 33: ...5 Test Procedure b2 electronic GmbH DHV0078 b2 EN 33 Connection diagram vacuum bottle test...
Page 47: ...5 Test Procedure b2 electronic GmbH DHV0078 b2 EN 47 5 5 Discharge Status...
Page 63: ...11 Declaration of Conformity b2 electronic GmbH DHV0078 b2 EN 63 HVA30 5...
Page 64: ...11 Declaration of Conformity 64 DHV0078 b2 EN b2 electronic GmbH HVA30 7 HVA40 5 HVA54 3...
Page 65: ...11 Declaration of Conformity b2 electronic GmbH DHV0078 b2 EN 65 HVA54 5...
Page 66: ...11 Declaration of Conformity 66 DHV0078 b2 EN b2 electronic GmbH HVA60...
Page 67: ...11 Declaration of Conformity b2 electronic GmbH DHV0078 b2 EN 67 HVA68 2...
Page 68: ...11 Declaration of Conformity 68 DHV0078 b2 EN b2 electronic GmbH HVA90 HVA94...
Page 69: ...11 Declaration of Conformity b2 electronic GmbH DHV0078 b2 EN 69 HVA120...