5 Test Procedure
32
DHV0078 b2 EN
©
b2 electronic
GmbH
5
Test Procedure
5.1
Equipment Setup
Steps
S1-S9
describe the
equipment setup
procedure. When carrying out multiple
tests, the earth and power supply connections must always remain intact. The HV
test lead must be reconnected before each subsequent test (i.e. repeat procedure
as of step S3).
Connection diagram: VLF withstand test
Connection diagram: sheath test and fault location
DANGER
Electric shock hazard!
All procedures must comply with local safety regulations.
•
Before operating the HVA, equipment setup procedure must be completed!
•
Cables must be connected in the proper sequence!
•
Before turning on the power supply and before activating the HVA, verify that
all system elements are properly grounded!
See 5.1 – Equipment Setup: Steps
S1-S7
Summary of Contents for HVA34
Page 2: ...1 Introduction 2 DHV0078 b2 EN b2 electronic GmbH...
Page 11: ...2 Safety b2 electronic GmbH DHV0078 b2 EN 11...
Page 33: ...5 Test Procedure b2 electronic GmbH DHV0078 b2 EN 33 Connection diagram vacuum bottle test...
Page 47: ...5 Test Procedure b2 electronic GmbH DHV0078 b2 EN 47 5 5 Discharge Status...
Page 63: ...11 Declaration of Conformity b2 electronic GmbH DHV0078 b2 EN 63 HVA30 5...
Page 64: ...11 Declaration of Conformity 64 DHV0078 b2 EN b2 electronic GmbH HVA30 7 HVA40 5 HVA54 3...
Page 65: ...11 Declaration of Conformity b2 electronic GmbH DHV0078 b2 EN 65 HVA54 5...
Page 66: ...11 Declaration of Conformity 66 DHV0078 b2 EN b2 electronic GmbH HVA60...
Page 67: ...11 Declaration of Conformity b2 electronic GmbH DHV0078 b2 EN 67 HVA68 2...
Page 68: ...11 Declaration of Conformity 68 DHV0078 b2 EN b2 electronic GmbH HVA90 HVA94...
Page 69: ...11 Declaration of Conformity b2 electronic GmbH DHV0078 b2 EN 69 HVA120...